My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01000 - 2 <br />SUMMARY OF WORK <br /> <br /> Perform a well “yield test” to confirm that the original design production rate 600 gpm/ft <br />head has been achieved. Additional well development may be required until that rate has <br />been achieved. <br /> Insert concrete grout between the existing casing and the new 20” PVC casing using <br />“tremie” method. Replace steel grate/screen on top of the well casing and restore the site <br />(asphalt, concrete paving, concrete curbing or sodding if damaged during maintenance <br />activities). <br /> Perform condition assessment on three (3) outfall pipes (10”, 16” and 12” diameters) <br />identified on the Project Location Map and several others observed during recent site <br />visit to assure that they are plugged/abandoned per the original design plans. The intent <br />is that the North Bay Road street system is not impacted by high tides backing up and <br />causing street flooding. If the outfalls are not plugged, CONTRACTOR shall install inline <br />check valves that will allow one directional flow from upland street level to the Intercoastal <br />waterway only. <br /> Some of the existing gravity wells may be converted to “mini injection wells” in order to <br />attain better discharge capacity and provide a greater relief to the project area. OWNER <br />may direct CONTRACTOR to furnish design, permitting, materials, labor, and equipment <br />to convert selected drainage wells to injection wells. <br />In performing the scope of work, the CONTRACTOR shall furnish all labor, materials, <br />transportation, tools, supplies, equipment and necessary appurtenances to rehabilitate and <br />re-develop the wells and address the outfall piping to the satisfaction of the OWNER as <br />specified herein. <br />1.2 EQUIPMENT AND PERSONNEL <br />The CONTRACTOR shall furnish capable personnel and equipment required to handle the <br />materials and perform the tasks specified herein. The OWNER or its ENGINEER shall <br />reserve the right to inspect the equipment of the CONTRACTOR to assure qualification. The <br />awarded CONTRACTOR shall repair or replace any equipment not considered by the <br />OWNER or ENGINEER to be satisfactory. At the OWNER’s discretion, the CONTRACTOR <br />shall demonstrate the accuracy and precision of the CONTRACTOR’S methods of <br />measurement. <br />The CONTRACTOR shall provide and mobilize a clean water storage tank, for the <br />CONTRACTOR’S use onsite. The tank shall be acceptable to the OWNER and be used for <br />storage of water and sludge/debris to be removed and disposed of at an approved/licensed <br />facility. <br />1.3 SITE CONDITIONS <br />Each well site is located in an area with adequate access. The CONTRACTOR shall use the <br />designated access location for each well site. The CONTRACTOR is assumed to have
The URL can be used to link to this page
Your browser does not support the video tag.