My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 01025 - 4 <br />MEASUREMENT AND PAYMENT <br /> <br /> <br />F. ITEM NO. 6 – WELL DEVELOPMENT (INCLUDING AIRLIFT, JETTING WITH <br />SIMULTANEOUS AIRLIFT, AND PUMP DEVELOPMENT): Well Development (sludge <br />removal) shall be paid for at the Contract Unit Cost Price as listed on the BID FORM as <br />determined by the ENGINEER as development and as described in Section 03500. The <br />said Contract Unit Price shall include only hours of actual pumping as approved by the <br />ENGINEER and shall not be limited to the furnishing of all material, labor and equipment <br />necessary to complete development in accordance with the Contract Documents and <br />accepted by the Engineer. <br /> <br />G. ITEM NO. 7 – “AFTER” DOWNHOLE VIDEO AND LOG: The video log, taken subsequent <br />to completion of cleaning of the existing concrete well structures and the existing well <br />casings, shall be paid following each successful video log for wells at the Contract Lump <br />Sum Price listed on the Bid Form as specified in the Contract Documents and accepted <br />by the ENGINEER. Video logging shall include but not be limited to the furnishing of all <br />material, labor and equipment required, as specified in Section 03300. Only successful <br />video logs accepted by the ENGINEER will be paid for under this pay item. Video shall <br />be conducted by a professional video logger specializing in downhole well videos. <br /> <br />H. ITEM NO. 8 – SITE RESTORATION: The work specified under this pay item includes <br />restoring the site to its original condition, restoring site conditions to the satisfaction of <br />the ENGINEER and OWNER and as described in Section 01535. Restoration includes <br />replacement of sodding, asphalt pavement, concrete pavement and/or sidewalks, <br />concrete curbing. Payment shall be at the Contract Lump Sum Price, for all twenty (20) <br />well sites, as listed on the Bid Form and shall include all equipment, tools and labor <br />necessary to restore the site complete and accepted by the OWNER. <br /> <br />ALTERNATE 1 <br /> <br />I. ITEM NO. 9 – INSTALL NEW 20-INCH DIAMETER PVC LINER CASING: The <br />CONTRACTOR shall supply and install the specified amount of PVC Liner in accordance <br />with the actual casing depth determined by the “before” downhole video results. <br />Measurement and payment for this item shall be made at the Contract Unit Price for the <br />actual amount installed at each well location as listed on the Bid Form and as specified <br />in the Contract Documents and accepted by the ENGINEER. <br /> <br />J. ITEM NO. 10 – CONCRETE GROUT (TREMIE) 20-INCH LINER: The CONTRACTOR <br />shall supply and install appropriate amount of concrete grout using “tremie” method in <br />the annular space between the existing 24” casing and the new 20” PVC liner to restore
The URL can be used to link to this page
Your browser does not support the video tag.