Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 02762 - 12 <br />TELEVISING STORM SEWER SYSTEMS <br /> <br /> <br /> <br />X. Video recordings shall include a continuous video display/readout of similar <br />information, as described in paragraph 3.08 herein. A separate digital video file <br />shall be made for each pipe reach inspected. <br /> <br />AA. Contractor shall coordinate with the Owner prior to commencement of Work to <br />ensure inspection is accomplished in a manner acceptable to the Owner. <br /> <br />BB. If the video and/or audio recording is of poor quality, the Owner has the right to <br />require a re-submittal of the affected sewer sections and no payment will be <br />made until an acceptable video and audio recording is made, submitted to, and <br />accepted by the Owner. <br /> <br />CC. Measurement for location of defects and actual length of pipe shall be by <br />means of a calibrated meter on the camera with a digital readout on the video <br />monitor. This readout shall be included in the video recording. Marking on <br />cable, or the like, which would require interpolation for depth of manhole, will <br />not be allowed. Measurement will be accurate to 1-foot per 100-feet of <br />inspected pipe. <br /> <br />DD. The Contractor inspection units shall be equipped with adequate back up <br />equipment and spare parts so field repairs to equipment can be made and <br />down time is minimized. <br /> <br />EE. The Contractor shall be responsible for all traffic control measures required to <br />perform the Work. <br /> <br />FF. Lateral inspections shall be performed from the main line using a lateral launch <br />camera or shall be pushed from cleanouts to the sewer main using sewer rods. <br />Lateral camera travel measurements shall be displayed on screen and on the <br />captured video. <br /> <br />GG. If lateral inspections are performed from the sewer main as part of the main line <br />inspection, the lateral shall be logged in the main line inspection report per <br />PACP requirements and the "comment" field of the main line inspection report <br />shall be used to document the lateral identification number, defects observed, <br />footage of all lateral defects, connecting pipes and clean outs. If lateral <br />inspections are not performed as part of the main sewer inspection, a separate <br />PACP pipe inspection record shall be created for each lateral. Refer to <br />paragraph 3.10 for numbering requirements.