Laserfiche WebLink
Wednesday, April 25, 2018 <br />exceed 29 nephelometric turbidity units (NTU) above background conditions. <br />Where applicable, the CONTRACTOR shall maintain appropriate water quality <br />monitoring records demonstrating compliance with turbidity requirements in the <br />receiving water body. <br /> <br />a. Biscayne Bay is a protected body of water. Water quality standards to <br />discharge into the bay are very difficult to impossible to attain. Can we <br />assume that development discharge will go into nearby wells? <br /> <br />Response: Yes. Please refer to response #9. <br /> <br />b. What is the protocol for development water if the 29NTU standard is not <br />r eached? The wells on the project have been used for stormwater <br />discharge for approx. 10 years it might not be possible to reach this level of <br />water clarity. Can the city qualify a maximum # of hours of development <br />time? <br /> <br />Response: Contractor to use 8 hours of development time in lieu of the 29NTU <br />standard. <br /> <br /> <br /> Revision: (Note: Deletions will be indicated by strikethrough, additions will be <br />indicated with bold font): <br /> <br />2.36 LIQUIDATED DAMAGES FOR INCOMPLETE PROJECTS <br /> <br />Original Contract Amount Daily Charge Per Calendar Day <br /> <br />$50,000 and under..........................................................................................$763 <br /> <br />Over $50,000 but less than $250,000..............................................................$958 <br /> <br />$250,000 but less than $500,000..................................................................$1,099 <br /> <br />Remainder of section 2.36 remains the same. <br /> <br /> <br /> <br />END OF SECTION