My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jaffer Well Drilling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
Responses
>
Jaffer Well Drilling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 9:28:48 AM
Creation date
5/3/2018 9:26:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
North Bay Road Drainage Improvements
Bid No. (xx-xx-xx)
18-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> THE AMERICAN INSTITUTE OF ARCHITECTS <br /> AIA Document A310 <br /> Bid Bond <br /> KNOW ALL MEN BY THESE PRESENTS, THAT WE Jaffer Well Drilling, A Division of A.C. Schultes of Florida, Inc. <br /> 1451 SE 9th Court. Hialeah, FL 33010 <br /> as Principal, hereinafter called the Principal, and Western Surety Company <br /> 333 South Wabash Ave.41-South, Chicago. IL 60604 <br /> a corporation duly organized under the laws of the State of SD <br /> as Surety, hereinafter called the Surety, are held and firmly bound unto Sunny Isles Beach Government Center <br /> 18070 Collins Avenue 4th Floor, Sunny Isles Beach, FL 33160 <br /> as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid <br /> Dollars ($ 5% ), <br /> for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, <br /> executors, administrators, successors and assigns,jointly and severally,firmly by these presents. <br /> WHEREAS, the Principal has submitted a bid for North Bay Road Drainage Improvements 18-04-01 <br /> NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with <br /> the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or <br /> Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt <br /> payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter <br /> such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the <br /> penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith <br /> contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise <br /> to remain in full force and effect. <br /> Signed and sealed this 30th day of April , 2018 <br /> Jaffer Well Drilling, A Division of A.C.;Schultes of Florida, Inc. <br /> .0 , • <br /> (Principal) ` _ (Seal),, <br /> itness) - <br /> r, ,wit e) <br /> 1 Li Western Surety Company .7 <br /> I - (Suety) (Seal) <br /> Kelly G. Hennessy,Witness (Witness) / <br /> -49.1•rne' ' aniel P. Duniga (Title) <br /> ALA DOCUMENT A310•BID BOND•ALA•FEBRUARY 1970 ED.•THE AMERICAN <br /> INSTITUTE OF ARCHITECTS,1735 N.Y.AVE.,N.W.,WASHINGTON,D.C.20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.