My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2026
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2013 11:37:52 AM
Creation date
2/27/2013 11:37:49 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2026
Date (mm/dd/yyyy)
02/21/2013
Description
1st Amendment to Agmt w/Iron Sky for ALPR System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • b • <br /> ?1.'•••• G•lO 3" <br /> R <br /> tOr Or pJM.e <br /> at the proposer's expense and the contract cancelled or (2)the City may require the proposer to <br /> replace the materials at the proposer's expense. <br /> In the event that material Is suspected by the City Representative of being reused or not new In <br /> original packaging, the material may be rejected. The Proposer shall remove such material and <br /> replace It at his/her cost and within the original schedule. No provisions or allotments for delays <br /> or time extensions to the schedule as a result of "defective", unacceptable material, or reused <br /> material found shall be granted. <br /> 2.14 LABOR.I4ATERIALS—AND E• NT SHALL BE SUPPLIED BY THE PR• • • R <br /> Unless otherwise provided in Section 3 of this solicitation the proposer shall furnish the following, <br /> induding but not limited to, all labor, material, equipment, barricading, adequate supervision, <br /> and coordination for satisfactory contract performance. When not spedflcaly identified In the <br /> technical specifications, such materials and equipment shall be of a suitable type and grade for <br /> the purpose. All material, workmanship, 100% design, testing and equipment shall be subject to <br /> the inspection and approval of the City's Project Manager. <br /> 2.15 CJEAN-UP <br /> All unusable materials and debris shall be removed from the premises at the end of each <br /> workday, and dIsposed of in an appropriate manner. Upon final completion, the proposer shall <br /> thoroughly dean up all areas where work has been involved as mutually agreed with the <br /> associated user department's project manager. <br /> 2.16 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A <br /> NOTICE TO PROCEED; <br /> The proposer shall neither commence any work, nor enter a City work premise, until a written <br /> Notice to Proceed (NTP) directing the proposer to proceed with the work has been received by <br /> the proposer from any authorized City manager or his designee representative; provided <br /> however,that such notification shall be superseded by any emergency work that may be required <br /> In accordance with provisions induded elsewhere In this solicitation and resultant contract. <br /> 2.17 WARRANTY SHALL BE SUP• ED IN WRITTEN FORM <br /> A. Type of Warranty Coverage Required <br /> The propose shall provide a copy of its written warranty certificates with its Initial offer, <br /> or upon request from the City. Failure to meet this requirement may result in the offer <br /> being deemed non-responsive. The warranty supplied by the propose shall remain in <br /> force for the full period identified by the proposer; regardless of whether the propose is <br /> under contract with the City at the time of defect. Any payment by the City on behalf of <br /> the goods or services received from the proposer does not constitute a waiver of these <br /> warranty provisions. Proposer's warranties shall be 1 year from final completion shall <br /> City of Sunny Isles Beach !Request for Proposal No. 12-09-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.