STATE OF FLORIDA; DEPARTMENT OF MANAGEMENT SERVICES AE FEE CA... Page 1 of I
<br /> Fee Guide Calculator \ _
<br /> For Architectural and Engineering Services •-, - tom "
<br /> - PPS:�` p,''�''' am„'
<br /> State of Florida,Department of Management Services . ' :-;
<br /> Version Posted:March 2012
<br /> Project Name:
<br /> CONSTRUCTION COMPLEXITY GROUP-PERCENTAGE
<br /> COST FOR BUILDING
<br /> (Sitexork Not Included) A B C 0 E OF G
<br /> 0 7,500,000 7.70% 7.20% 7.87% 6.70% 6.22% 5.73% 7.02%
<br /> -
<br /> CALCULATED FEE $577,628 $540,140 $589,909 $502,575 $466,125 $429,578 $526,231
<br /> Instructions: Fill in probable construction cost at left and push enter key.
<br /> GROUP DEFINITIONS:
<br /> "A"-CONSIDERABLY MORE THAN AVERAGE COMPLEXITY:Complex Laboratories,Medical Hospitals
<br /> "B"-MORE THAN AVERAGE COMPLEXITY:Average Laboratories,Mental Hospitals,Simple Medical Hospitals,Clinics,Court Houses,
<br /> Theatres,Complex University Buildings,Special Purpose Classrooms,Laboratory Classrooms,Libraries,Auditoriums,Museums,Air Terminals,
<br /> Food Service Facilities,Specialized Detention Areas,Detention-Treatment Areas,Residences,Emergency Management Centers
<br /> "C"-REPAIRS AND RENOVATIONS:Miscellaneous Repairs and Renovations,Alterations to Office Space or Dormitory Space,Fire Code
<br /> Corrective Work
<br /> "D"-AVERAGE COMPLEXITY:General Office Space,General Teaching Space,Gymnasiums,General Detention Living Facilities,Factory
<br /> Buildings
<br /> "E"-LESS THAN AVERAGE COMPLEXITY:Apartment Buildings,Dormitory Buildings,Service Garages,Stadiums,Repetitive Design Facrnties,
<br /> Office Buildings With Undefined Interior Space(open for later partitioning),Specialized Parking Structures
<br /> "F"-CONSIDERABLY LESS THAN AVERAGE COMPLEXITY:Warehouses,(ParkitiglGarsges;,Storage Facilities
<br /> "G"-BUILDING ENGINEERING SERVICES:Mechanical,Electrical and Structural not exceeding$1,000,000 in construction(Not including Site
<br /> Civil)
<br /> ADDITIONAL SERVICES&EXPENSES: ��
<br /> The following services are considered Additional to Basic Services and are not included within
<br /> the basic fee represented by the fee guides:
<br /> -Feasibility Studies/Analysis -LEED Consultation
<br /> -Facility Programming -Graphic and Signage Design
<br /> -Master Planning -Special Code Reviews including ACHA
<br /> -Soils Investigations/Reports -Detailed Cost Estimates
<br /> -Surveys-Topographic/Boundary -Documents Prepared For.
<br /> VeoetetcrJtlmerrn'emenSNtiliaes -Alternate Bids Exceeding Contract Scone
<br /> -Measured Drawings of Existing Facilities -EAces ive Change Orders
<br /> -Existing Facilities Analysis -Multiple Construction Contracts
<br /> -Toxic Substance Mitigation Surveys and Consultation -Record Documents/As Built
<br /> -Site Environmental Assessments -Prolonged Construction Contract Administration Services
<br /> -Site DRI,PUD,Site Plan Review and/or Zoning Modifications -Structural Threshold Inspections
<br /> -Traffic Analysis and Traffic Signal Warrant Studies -Project Representation During
<br /> -Civil Engineering Design including Construction Beyond Si-Monthly Administration
<br /> Paving/Grading/Utilities
<br /> /Drainage/Stormwater Management/Environmental&All Site -Additional Construction Contract
<br /> Permitting Administration Services for Multiple Contracts
<br /> -Existing Site Utility Infrastructure Improvements -Building Commissioning and Training Services
<br /> -Site Lighting Design -Post Occupancy Inspections/Evaluations
<br /> -Landscape Architectural&Irrigation Design -Renderings/Models
<br /> -Specialty Consultants -Substantive Changes to Scope,Size or Complexity
<br /> Voice/Data Communications;Electronic/Audio -Owner Requested Changes to Approved Documents
<br /> Visual;Food Service Equipment Hazardous -Reimbursable Expenses'
<br /> Materiat Hospital/Laboratory;Interior Design; Including,but not limited to,reproduction/printing costs,
<br /> Indoor Air Quality,Quality Control;
<br /> Theater/Acoustical;Security travel expenses and special mad service expenses
<br /> -Life Cycle Cost(ROI)and/or Federal DOE Energy Analysis
<br /> •As defined in the Division of Real Estate Development and Management Form of Agreement Between Owner and Architect-Engineer.
<br /> http://fp.state.fl.us/docs/DMSAEFeeGuideCalculate.asp 1/25/2013
<br />
|