Laserfiche WebLink
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 - GENERAL <br /> 1.01 RELATED REQUIREMENTS <br /> A. General provisions of Contract, including General and Supplementary <br /> Conditions. <br /> B. Other Division-1 Specification Sections. <br /> 1.02 SECTION INCLUDES <br /> A. Administrative and procedural requirements for determining Work completed <br /> under unit price contract. <br /> 1.03 GENERAL REQUIREMENTS <br /> A. Lump Sum and unit prices shall include the providing of all costs required for the <br /> complete demolition as noted, construction of the specified unit of work including <br /> cost of materials and delivery; cost of installation labor, including social security, <br /> insurance, and other required fringe benefits, workman's compensation <br /> insurance; bond premiums; rental of equipment and machinery; taxes; testing; <br /> surveys and other incidental expenses; and supervision. <br /> aB. The Owner reserves the right to reject the Contractor's measurement of <br /> completed work that involves use of established unit prices, and to have this <br /> Work measured by an independent surveyor acceptable to the Contractor at the <br /> Owner's expense. <br /> C. Contract Sum adjustments will be by Change Order on basis of net accumulative <br /> change for each unit price category. <br /> 1. Except as otherwise specified, unit prices shall apply to both deductive <br /> 1 <br /> 2. and additive variations of quantities. <br /> Lump sum and unit prices in the Agreement shall remain in effect until <br /> date of final completion of the entire Work. <br /> D. Partial payment for material and equipment properly stored and protected will be <br /> made in accordance with requirements of the General Conditions. <br /> E. Payment will be made at the respective contract unit and lump sum price for <br /> each item shown in the Agreement, installed and accepted, which price and <br /> payment shall constitute full compensation for furnishing all materials and <br /> performing all Work in connection therewith and incidental thereto. No separate <br /> payment will be made for testing. <br /> 1 <br /> 05/08 01025-1 05-4893 <br />