My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> where applicable, and the appurtenant items for which separate payment is <br /> not specifically included in the Bid Schedule. <br /> 3. Conflict structures will include pipe sleeve, if required. <br /> C. Connect to Existing Drainage Pipe <br /> 1. Measurement for payment for connecting to drainage pipes will be based <br /> upon the actual quantity, each, of such connections, all in accordance with <br /> the requirement of the Contract Documents. <br /> 1 2. Payment for connecting to existing drainage pipes will be made at the unit <br /> price, each, named in the Bid Schedule, which price shall constitute full <br /> compensation for the completed installation of the connection including but <br /> not limited to excavation, dewatering, backfill and compaction, removing <br /> existing knockout plug where applicable, saw cutting, grouting, construction <br /> of the connection, restoration, all else necessary for a complete and <br /> 1 functional installation, and the appurtenant items for which separate payment <br /> is not specifically included in the Bid Schedule. <br /> D. Remove and Dispose of Existing Drainage Pipe <br /> 1 1. Measurement for payment to remove and dispose of existing drainage pipe <br /> will be based upon the actual number of linear feet of such pipe actually <br /> removed all in accordance with the Contract Documents. <br /> 2. Payment for removal and disposal of existing drainage pipe will be made at <br /> Q the unit price per linear foot of pipe named in the Bid Schedule, which price <br /> shall constitute full compensation for the removal and disposal of such <br /> drainage pipe including backfilling and all restoration work. <br /> E. Remove and Dispose of Existing Drainage Structure <br /> 1. Measurement for payment to remove and dispose of existing drainage <br /> structures will be based upon the actual number, each, of such structures <br /> actually removed all in accordance with the Contract Documents. <br /> 1 2. Payment for removal and disposal of existing drainage structures will be <br /> made at the unit price, each, named in the Bid Schedule, which price shall <br /> constitute full compensation for the removal and disposal of each catch basin <br /> or storm maintenance structure, including backfilling and all restoration work. <br /> F. Furnish and Install Asphalt Concrete Pavement <br /> 1 1. Measurement for payment of asphalt concrete pavement will be based upon <br /> the number of square yards of such asphalt concrete pavement actually <br /> 1 constructed, as detailed in the Drawings, all in accordance with the Contract <br /> Documents. <br /> 2. Payment for placement of asphalt concrete pavement and the thickness <br /> indicated will be made at the unit price per square yard for such placement as <br /> 05/08 01025-3 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.