My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' B. Continuation Sheets: <br /> 1. Fill in total list of scheduled component items of work, with item number <br /> and scheduled dollar value for each item. <br /> 2. Fill in dollar value in each column for each scheduled line item when work <br /> has been performed or products stored. <br /> a. Round off values to nearest dollar, or as specified. <br /> 3. List each Change Order Number, and description, as for an original <br /> component item or work. <br /> a. List by Change Order Number, and description, as for an original <br /> component item or work. <br /> 1.05 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS <br /> A. When the Owner or the Engineer requires substantiating data, Contractor shall <br /> submit suitable information, with a cover letter identifying: <br /> 1. Project <br /> 2. Application number and date <br /> 3. Detailed list of enclosures <br /> 4. For stored products: <br /> ' a. Item number and identification as shown on application. <br /> b. Description of specific material. <br /> B. Submit one copy of data cover letter for each copy of application. <br /> C. As a prerequisite for payment, Contractor is to submit a "Surety Acknowledgment <br /> ' of Payment Request" letter showing amount of progress payment, which the <br /> Contractor is requesting. <br /> D. The Contractor shall maintain an updated a set of drawings to be used as a <br /> record drawings in accordance with Section 01720. As a prerequisite for monthly <br /> progress payments, the Contractor shall submit the updated record drawings for <br /> review by the Engineer. <br /> E. Construction schedule in accordance with 01310. <br /> 1.06 PREPARATION OF APPLICATION FOR FINAL PAYMENT <br /> A. Fill in Application form as specified for progress payments. <br /> tB. Use continuation sheet for presenting the final statement of accounting as <br /> specified in Section 01700 - Contract Closeout. <br /> C. Submit final record drawings. <br /> 1 1.07 SUBMITTAL PROCEDURE <br /> A. Submit Applications for Payment to the Engineer at the times stipulated in the <br /> Agreement. <br /> 1 05108 01152-2 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.