Laserfiche WebLink
I <br /> 1 c. Identify area of responsibility of each <br /> d. Local source of supply for parts and replacement. <br /> 4. Identify each product name and other identifying symbols as set forth in <br /> Contract Documents. <br /> IB. Product Data: <br /> I1. Include only those sheets which are pertinent to the specific product. <br /> 2. Annotate each sheet to: <br /> Ia. Clearly identify specific product or part installed. <br /> b. Clearly identify data applicable to installation. <br /> Ic. Delete references to inapplicable information. <br /> C. Drawings: <br /> I1. Supplement product date with drawings as necessary to clearly illustrate: <br /> a. Relations of component parts of equipment and systems. <br /> b. Control and flow diagrams. <br /> 2. Coordinate drawings with information in Project Record Documents to <br /> Iassure correct illustration of completed installation. <br /> 3. Do not use Project Record Documents as maintenance drawing. <br /> ID. Written text, as required to supplement product date for the particular <br /> installation: <br /> I1. Organize in consistent format under separate headings for different <br /> procedures. <br /> I2. Provide logical sequence of instructions of each procedure. <br /> 1 E. Copy of each warranty, bond and service contract issued: <br /> 1. Provide information sheet for Owner's personnel, give: <br /> 1 a. Proper procedures in event of failure. <br /> b. Instances which might affect validity of warranties or bonds. <br /> I1.06 MANUAL FOR MATERIALS AND FINISHES <br /> IA. Submit five copies of complete manual in final form. <br /> B. Content; for architectural products, applied materials and finishes: <br /> I1. Manufacturer's data, giving full information on products. <br /> 1 05/08 01730-3 05-4893 <br />