My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> C. Subbase Material: Naturally or artificially graded mixture of natural or crushed <br /> gravel, crushed stone, crushed slag, natural or crushed sand. <br /> D. Drainage Fill: Washed, evenly graded mixture of crushed stone, or crushed or <br /> uncrushed gravel, with 100 percent passing a 1-1/2 in. sieve and not more than 5 <br /> percent passing a No. 4 sieve. <br /> E. Backfill and Fill Materials: Satisfactory soil materials free of clay, rock or gravel <br /> larger than 2 in. in any dimension, debris, waste, frozen materials, vegetable and <br /> other deleterious matter. <br /> PART 3 - EXECUTION <br /> 3.01 EXCAVATION <br /> A. Excavation is Unclassified, and includes excavation to subgrade elevations <br /> indicated, regardless of character of materials and obstructions encountered. <br /> B. Unauthorized Excavation: Removal of materials beyond indicated subgrade <br /> elevations or dimensions without specific direction. Unauthorized excavation, as <br /> well as remedial work directed by Engineer, shall be at Contractor's expense. <br /> C. Additional Excavation: <br /> 1. When unsuitable bearing materials are encountered at required subgrade <br /> elevations, carry excavations deeper and replace excavated material as <br /> directed by Engineer. <br /> 1 2. Removal of unsuitable material and its replacement as directed will be <br /> paid on basis of contract conditions relative to changes in work. <br /> D. Stability of Excavations: <br /> 1. Slope sides of excavations to comply with local codes and ordinances <br /> having jurisdiction. <br /> 2. Shore and brace where sloping is not possible because of space <br /> 1 restrictions or stability of material excavated. <br /> 3. Maintain sides and slopes of excavations in safe condition until <br /> completion of backfilling. <br /> E. Shoring and Bracing: <br /> 1. Establish requirements for trench shoring and bracing to comply with local <br /> 1 <br /> 2. codes and authorities having jurisdiction. <br /> Maintain shoring and bracing in excavations regardless of time period <br /> excavations will be open. Carry down shoring and bracing as excavation <br /> progresses. <br /> F. Dewatering: <br /> 1 1. Prevent surface water and subsurface or ground water from flowing into <br /> excavations. <br /> 2. Do not allow water to accumulate in excavations. <br /> I <br /> e05/08 02200-2 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.