Laserfiche WebLink
0 <br /> 3.04 GRADING <br /> A. Grading Outside Building Lines: Grade areas adjacent to building lines to drain <br /> away from structures and to prevent ponding and as follows: <br /> 1. Finish to within not more than 0.10 ft. above or below required subgrade <br /> 1 <br /> 2. elevations. <br /> Walks: Shape surface to line, grade and cross-section, with finish surface <br /> not more than 0.10 ft. above or below required subgrade elevation. <br /> 3. Pavements: Shape surface to line, grade and cross-section, with finish <br /> surface 1/2 in. above or below required subgrade elevation. <br /> B. Grading Surface of Fill under Building Slabs: Grade smooth and even, free of <br /> voids, compacted as specified, and to 1/2 in. below required elevation. <br /> 1 3.05 FIELD QUALITY CONTROL <br /> A. Contractor will engage soil testing and inspection service for quality control <br /> testing during earthwork operations. <br /> B. Allow testing service to inspect and approve subgrades and fill layers before <br /> further construction work is performed. <br /> C. If in opinion of Engineer, based on testing service reports and inspection, <br /> subgrade or fills which have been placed below specified density, provide <br /> additional compaction and testing at no additional expense to Owner. <br /> 3.06 CLEANING AND PROTECTION <br /> A. Protect newly graded areas from traffic and erosion. Keep free of trash and <br /> debris. <br /> B. Repair and re-establish grades in settled, eroded, and rutted areas to specified <br /> tolerances. <br /> C. Remove excess excavated and waste materials, including unacceptable <br /> excavated material, trash and debris, and legally dispose of it off Owner's <br /> property. <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 05/08 02200-5 05-4893 <br />