I <br /> B. The Contractor shall, at all times during construction, provide and maintain <br /> proper equipment and facilities to remove promptly and dispose of properly all <br /> water entering excavations and keep such excavations dry so as to obtain a <br /> satisfactory undisturbed subgrade foundation condition until the fill and structure <br /> to be built thereon have been completed to such extent that they will not be <br /> floated or otherwise damaged by allowing water levels to return to natural <br /> elevations. <br /> C. Dewatering shall at all times be conducted in such a manner as to preserve the <br /> natural undisturbed bearing capacity of the subgrade soils at proposed bottom of <br /> excavation. <br /> D. Welipoints may be required for predrainage of the soils prior to final excavation <br /> for some of the deeper in-ground structures, and for maintaining the lowered <br /> groundwater level until construction has been completed to such an extent that <br /> the structure or fill will not be floated or otherwise damaged. Welipoints shall be <br /> surrounded by suitable filter sand and no fines shall be removed by pumping. <br /> Pumping from wellpoints shall be continuous and. standby pumps shall be <br /> provided. <br /> ' E. The Contractor shall furnish all materials, permits and equipment and perform all <br /> work required to install and maintain the drainage systems he proposes for <br /> handling groundwater and surface water encountered during construction of <br /> structures and compacted fills. <br /> F. If requested by the Engineer, the Contractor's proposed method of dewatering <br /> shall include a groundwater observation well at each structure to be used to <br /> determine the water level during construction of the structure. Locations of the <br /> observation wells shall be at structures as approved by the Engineer prior to their <br /> ' installation. The observation wells shall be extended to 6 inches above finished <br /> grade, capped with screw-on caps protected by 24" x 24" wide concrete base, <br /> and left in place at the completion of this Project. <br /> t G. Prior to excavation, the Contractor shall submit his proposed method of <br /> dewatering and maintaining dry conditions to the Engineer for approval. <br /> However, such approval shall not relieve the Contractor of the responsibility for <br /> the satisfactory performance of the system. The contractor shall be responsible <br /> for correcting any disturbance or natural bearing soils or damage to structures <br /> caused by an inadequate dewatering system or by interruption of the continuous <br /> operation of the system as specified. <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS <br /> A. General: <br /> 1. Materials for use as base, fill and backfill shall be as described below. <br /> a. Satisfactory soil materials are defined as those complying with <br /> ASTM D-2321 soil classification designation Class I, II, and III. <br /> 05/08 02221-3 05-4893 <br />