My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3.03 TRENCH EXCAVATION <br /> A. Excavation for all trenches required for the installation of pipes shall be made to <br /> the depths indicated on the Drawings. Excavate trench to provide minimum of <br /> 30-inch clear cover over the pipe bell unless otherwise noted on the Drawings. <br /> Excavate in such manner and to such widths as will give suitable room for laying <br /> the pipe within the trenches, for bracing and supporting and for pumping and <br /> drainage facilities. The trench width at the top of the pipe shall not exceed the <br /> allowable as determined by the depth of cut and indicated on the Drawings. <br /> B. Remove vegetation, debris, unsatisfactory soil materials, obstructions, and <br /> deleterious materials from ground surface prior to placement of fills. Plow strip, <br /> or break-up sloped surfaces steeper than 1 vertical to 4 horizontal so that fill <br /> material will bond with existing surface. <br /> C. Rock shall be removed to a minimum 8-inches clearance around the bottom and <br /> sides of all the pipe or ducts being laid. <br /> D. Where pipe is to be laid in limerock bedding or encased in concrete, the trench <br /> may be excavated by machinery to or just below the designated subgrade <br /> ' provided that the material remaining in the bottom of the trench remains <br /> undisturbed. <br /> 1 E. Where the pipes or ducts are to be laid directly on the trench bottom the lower <br /> part of the trenches shall not be excavated to the trench bottom by machinery. <br /> The last of the material being excavated shall be done manually in such a <br /> manner that will give a flat bottom true to grade so that pipe can evenly and <br /> uniformly supported along its entire length on undisturbed material or bedding <br /> rock. Bell holes shall be made as required manually so that there is no bearing <br /> surface on the bells and pipes are supported along the barrel only. <br /> F. The bottom of the excavations shall be firm and dry and in all respects <br /> acceptable to the Engineer. Excavate any organic soil material from the bottom <br /> of the trench and replace with rock bedding, at least 4 inches thick. <br /> G. Excavation is Unclassified, and includes excavation to subgrade elevations <br /> indicated, regardless of character of materials and obstructions encountered. <br /> H. Unauthorized Excavation: Removal of materials beyond indicated subgrade <br /> elevations or dimensions without specific direction. Unauthorized excavation, as <br /> well as remedial work directed by Engineer, shall be at Contractor's expense. <br /> I. Additional Excavation: <br /> 1. When unsuitable bearing materials are encountered at required subgrade <br /> ' elevations, carry excavations deeper and replace excavated material as <br /> directed by Engineer. <br /> 1 2. Removal of unsuitable material and its replacement as directed will be <br /> paid on basis of contract conditions relative to changes in work. <br /> 05/08 02221-6 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.