Laserfiche WebLink
1 <br /> SECTION 02611 <br /> REINFORCED CONCRETE PIPE <br /> PART 1 - GENERAL <br /> 1.01 SCOPE OF WORK <br /> A. Furnish all labor, materials, equipment and incidentals required and install in the <br /> locations as shown on the drawings, the reinforced concrete pipe (R.C.P.) and <br /> appurtenances as described herein. <br /> 1.02 RELATED WORK <br /> A. Section 02221: Trenching, Bedding and Backfill for Pipe <br /> 1.03 DESCRIPTION OF SYSTEM <br /> A. Piping shall be installed at the location shown on drawings. <br /> 1.04 QUALIFICATIONS <br /> A. All R.C.P. and appurtenances shall be furnished by a single manufacturer who is <br /> fully experienced, reputable, and qualified in the manufacture of the items to be <br /> furnished. The equipment shall be designed, constructed, and installed in <br /> accordance with the best practices and methods and shall comply with these <br /> Specifications. <br /> 1.05 SUBMITTALS <br /> A. Shop drawings shall be submitted to the Engineer for approval and shall include <br /> dimensioning and technical specification for all piping to be furnished. <br /> 1.06 TOOLS <br /> A. Special tools, solvents, lubricants, and caulking compounds required for normal <br /> installation shall be furnished with the pipe. <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS <br /> A. R.C.P. shall be in accordance with ASTM C-76-88 Class II wall B and as <br /> manufactured by United States Concrete Pipe Co. or approved equal. <br /> B. All pipe shall be bundled or packaged in such a manner as to provide adequate <br /> 1 protection for the ends, threaded, or flanged, during transportation from the <br /> manufacturer. <br /> 1 <br /> 05/08 02611-1 05-4893 <br />