My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION 02931 <br /> SODDING <br /> PART 1 - GENERAL <br /> 1.01 WORK INCLUDED <br /> A. Furnish all labor, materials, equipment and incidentals required to prepare lawn <br /> bed and install sodding as shown on contract drawings and as specified herein. <br /> B. Area to receive sodded grass lawns within the landscape limits shown on the <br /> drawings except as noted herein shall be as designated on the Drawings. <br /> 1.02 SUBMITTALS <br /> A. Provide technical data as specified in Section 01340 for shop drawings on all <br /> materials or installation procedures required under this Section. <br /> B. Submit representative topsoil samples for analysis by a private laboratory to <br /> determine nutrient deficiencies and outline a proper fertilization program. <br /> C. Submit as provided in Section 01720 certifications required for all sodding <br /> supplied. <br /> PART 2 - PRODUCTS <br /> 2.01 SOD <br /> A. Sod shall be St. Augustine Floritam of firm texture having a compacted growth <br /> and good root development as approved. <br /> B. Sod shall be certified to meet Florida State Plant Board specifications, absolutely <br /> true to varietal type, and free from weeds or other objectionable vegetation, <br /> fungus, insects and disease of any kind. <br /> C. Before being cut and lifted, the sod shall have been mowed 3 times with the final <br /> mowing not more than a week before cutting into uniform dimensions. <br /> 1 2.02 SOIL CONDITIONERS <br /> A. Fertilizer: <br /> 1. Fertilizer shall be a complete fertilizer, the elements of which are derived <br /> from organic sources. Fertilizer shall be a standard product complying <br /> i <br /> 2. with State and Federal fertilizer laws. <br /> Percentages of nitrogen, phosphorus and potash shall be based on <br /> laboratory tests on soils outlined in Paragraph 1:02B and approved by the <br /> Engineer. For purpose of bidding, assume 6% nitrogen, 6% phosphorus <br /> and 6% potash by weight. At least 50% of the total nitrogen shall contain <br /> no less than 3% water-insoluble nitrogen. <br /> 05/08 02931-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.