My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 3.07 PLACING AND COMPACTING <br /> A. Unless otherwise permitted, the work begun on any day shall be completed in <br /> daylight of the same day. <br /> B. Concrete is not to be placed until reinforcing steel, pipes, conduits, sleeves, <br /> hangers, anchors and other work required to be built into concrete have been <br /> inspected and approved by the Engineer. Remove water and foreign matter from <br /> forms and excavation. All soil bottom for slabs and footings shall be approved by <br /> the Engineer before placing concrete. <br /> C. Transport concrete from mixer to place of final deposit as rapidly as practicable by <br /> ' methods which prevent separation of ingredients and displacement of <br /> reinforcement, and which avoid re-handling. Partially hardened concrete is not to <br /> be used. <br /> • <br /> D. "Cold joints" are to be avoided, but if they occur, are to be treated as bonded <br /> construction joints. <br /> E. At construction joints the surfaces of the concrete already placed, including vertical <br /> and inclined surfaces, shall be thoroughly cleaned of foreign materials and <br /> laitance, and weak concrete and roughened with suitable tools to expose a fresh <br /> face. At least two hours before and again shortly before the new concrete is <br /> deposited, the joints shall be saturated with water. After glistening water <br /> disappears, the joints shall be given a thorough coating of neat cement slurry <br /> mixed to the consistency of very heavy paste. The surfaces shall receive a coating <br /> at least 1/8-inch thick, well scrubbed-in by means of stiff bristle brushes whenever <br /> possible. New concrete shall be deposited before the neat cement dries. <br /> F. Deposit concrete to maintain, until the completion of the unit, a horizontal plastic <br /> surface. Vertical lifts shall not exceed 24-inches and preferably 18-inches. <br /> G. Chutes for conveying concrete shall be of U-shaped designed and sized to insure <br /> a continuous flow of concrete. Flat (coal) chutes shall not be employed. Chutes <br /> shall be metal or metal-lined and each section shall have approximately the same <br /> slope. The slope shall not be less than 25 nor more than 45 degrees from the <br /> horizontal and shall be such as to prevent the segregation of the ingredients. The <br /> discharge end of the chute shall be provided with a baffle plate or spout to prevent <br /> segregation. If the discharge end of the chute is more than 5 feet above the <br /> surface of the concrete in the forms, a spout shall be used, and the lower end <br /> maintained as near the surface of deposit as practicable. When the operation is <br /> intermittent, the chute shall discharge into a hopper. Chutes shall be thoroughly <br /> cleaned before and after each run, and the debris and any water shall be <br /> discharged outside the forms. Concrete shall not be allowed to flow horizontally <br /> over distances exceeding 5 feet. <br /> 1 H. In thin sections of considerable height, concrete shall be placed using suitable <br /> hoppers, spouts with restricted outlets, or otherwise, as required or approved. <br /> I. Concrete during and immediately after depositing shall be thoroughly compacted <br /> by means of suitable tools. Internal type mechanical vibrators shall be employed to <br /> produce required quality of finish. Vibration shall be done by experienced <br /> operators under close supervision and shall be carried on long enough to produce <br /> homogeneity and optimum consolidation without permitting segregation of the solid <br /> 05/08 03300-9 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.