Laserfiche WebLink
I <br /> effective to assign to Owner, or Engineer, or any of, (whether or not specifically incorporated by <br /> I their Related Entities, any duty or authority to reference in the Contract Documents); or <br /> supervise or direct the performance of the Work or <br /> any duty or authority to undertake responsibility b. the provisions of any Laws or Regulations <br /> inconsistent with the provisions of the Contract applicable to the performance of the Work <br /> I Documents. (unless such an interpretation of the provi- <br /> sions of the Contract Documents would <br /> 3.03 Reporting and Resolving Discrepancies result in violation of such Law or <br /> Regulation). <br /> A. Reporting Discrepancies <br /> 3.04 Amending and Supplementing Contract <br /> 1. Contractor's Review of Contract Documents <br /> I Documents Before Starting Work Before <br /> undertaking each part of the Work, Contractor shall A. The Contract Documents may be <br /> carefully study and compare the Contract amended to provide for additions, deletions, and <br /> I Documents and check and verify pertinent figures revisions in the Work or to modify the terms and <br /> therein and all applicable field measurements. conditions thereof by either a Change Order or a <br /> Contractor shall promptly report in writing to Work Change Directive. <br /> Engineer any conflict, error, ambiguity, or <br /> I discrepancy which Contractor may discover and B. The requirements of the Contract <br /> shall obtain a written interpretation or clarification Documents may be supplemented, and minor <br /> from Engineer before proceeding with any Work variations and deviations in the Work may be autho- <br /> I affected thereby. rized, by one or more of the following ways: <br /> 2. Contractor's Review of Contract 1. A Field Order; <br /> Documents During Performance of Work: If, during <br /> I the performance of the Work, Contractor discovers 2. Engineer's approval of a Shop Drawing or <br /> any conflict, error, ambiguity, or discrepancy within Sample; (Subject to the provisions of Paragraph <br /> the Contract Documents or between the Contract 6.17.D.3); or <br /> I Documents and any provision of any Law or <br /> Regulation applicable to the performance of the 3. Engineer's written interpretation or <br /> Work or of any standard, specification, manual or clarification. <br /> code, or of any instruction of any Supplier, <br /> I Contractor shall promptly report it to Engineer in 3.05 Reuse of Documents <br /> writing. Contractor shall not proceed with the Work <br /> affected thereby (except in an emergency as A. Contractor and any Subcontractor or <br /> I required by Paragraph 6.16.A) until an amendment Supplier or other individual or entity performing or <br /> or supplement to the Contract Documents has been furnishing all of the Work under a direct or indirect <br /> issued by one of the methods indicated in Paragraph contract with Contractor, shall not: <br /> 3.04. <br /> 1. have or acquire any title to or ownership <br /> 3. Contractor shall not be liable to rights in any of the Drawings, Specifications, <br /> Owner or Engineer for failure to report any conflict, or other documents (or copies of any thereof) <br /> I error, ambiguity, or discrepancy in the Contract prepared by or bearing the seal of Engineer or <br /> Documents unless Contractor knew or reasonably Engineer's consultants, including electronic media <br /> should have known thereof editions; or <br /> B. Resolving Discrepancies 2. reuse any of such Drawings, <br /> Specifications, other documents, or copies thereof <br /> 1. Except as may be otherwise specifically on extensions of the Project or any other project <br /> I stated in the Contract Documents, the provisions of <br /> the Contract Documents shall take precedence in without written consent of Owner and Engineer and <br /> specific written verification or adaption by Engineer. <br /> resolving any conflict, error, ambiguity, or discrepan- <br /> cy between the provisions of the Contract Docu- B. The prohibition of this Paragraph 3.05 will <br /> I ments and: survive final payment, or termination of the Contract. <br /> Nothing herein shall preclude Contractor from <br /> a. the provisions of any standard, retaining copies of the Contract Documents for <br /> Ispecification, manual, code, or instruction record purposes. <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright®2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> I00700- 10 <br /> 04/08 Final Version 05-4893 <br />