My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03 Differing Subsurface or Physical Conditions 2. Contractor shall not be entitled to any <br /> I adjustment in the Contract Price or Contract Times <br /> A. Notice: If Contractor believes that any if: <br /> subsurface or physical condition at or contiguous to <br /> the Site that is uncovered or revealed either: a. Contractor knew of the existence of such <br /> I <br /> conditions at the time Contractor made a <br /> 1. is of such a nature as to establish that any final commitment to Owner with respect to <br /> "technical data on which Contractor is entitled to Contract Price and Contract Times by the <br /> rely as provided in Paragraph 4.02 is materially submission of a Bid or becoming bound <br /> IIinaccurate; or under a negotiated contract; or <br /> 2. is of such a nature as to require a change b. the existence of such condition could <br /> I in the Contract Documents; or reasonably have been discovered or <br /> revealed as a result of any examination, <br /> 3. differs materially from that shown or investigation, exploration, test, or study of <br /> I indicated in the Contract Documents; or the Site and contiguous areas required by <br /> the Bidding Requirements or Contract Docu- <br /> 4. is of an unusual nature, and differs ments to be conducted by or for Contractor <br /> materially from conditions ordinarily encountered prior to Contractor's making such final corn- <br /> I and generally recognized as inherent in work of the mitment; or <br /> character provided for in the Contract Documents; <br /> c. Contractor failed to give the written notice <br /> then Contractor shall, promptly after becoming as required by Paragraph 4.03.A. <br /> I aware thereof and before further disturbing the <br /> subsurface or physical conditions or performing any 3. If Owner and Contractor are unable to <br /> Work in connection therewith (except in an agree on entitlement to or on the amount or extent, if <br /> I emergency as required by Paragraph 6.16.A), notify any, of any adjustment in the Contract Price or <br /> Owner and Engineer in writing about such condition. Contract Times, or both, a Claim may be made <br /> Contractor shall not further disturb such condition or therefor as provided in Paragraph 10.05. However, <br /> perform any Work in connection therewith (except as Owner and Engineer, and any of their Related <br /> I aforesaid) until receipt of written order to do so. Entities shall not be liable to Contractor for any <br /> claims, costs, losses, or damages (including but not <br /> B. Engineer's Review: After receipt of written limited to all fees and charges of engineers, <br /> I notice as required by Paragraph 4.03.A, Engineer <br /> will promptly review the pertinent condition, deter- architects, attorneys, and other professionals and all. <br /> court or arbitration or other dispute resolution costs) <br /> mine the necessity of Owner's obtaining additional sustained by Contractor on or in connection with any <br /> exploration or tests with respect thereto, and advise other project or anticipated project. <br /> I Owner in writing (with a copy to Contractor) of <br /> Engineer's findings and conclusions. 4.04 Underground Facilities <br /> C. Possible Price and Times Adjustments A. Shown or Indicated: The information and <br /> data shown or indicated in the Contract Documents <br /> 1. The Contract Price or the Contract Times, with respect to existing Underground Facilities at or <br /> or both, will be equitably adjusted to the extent that contiguous to the Site is based on information and <br /> I the existence of such differing subsurface or data furnished to Owner or Engineer by the owners <br /> physical condition causes an increase or decrease of such Underground Facilities, including Owner, or <br /> in Contractor's cost of, or time required for, perfor- by others. Unless it is otherwise expressly provided <br /> mance of the Work; subject, however, to the follow- in the Supplementary Conditions: <br /> follow- <br /> ing: <br /> 1. Owner and Engineer shall not be <br /> I a. such condition must meet any one or responsible for the accuracy or completeness of any <br /> more of the categories described in such information or data; and <br /> Paragraph 4.03.A; and <br /> 2. the cost of all of the following will be <br /> I b. with respect to Work that is paid for on a <br /> Unit Price Basis, any adjustment in Contract included in the Contract Price, and Contractor shall <br /> have full responsibility for: <br /> Price will be subject to the provisions of <br /> 1 Paragraphs 9.07 and 11.03. a. reviewing and checking all such informa- <br /> tion and data, <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright®2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 1 00700-t2 <br /> 04/08 Final Version 05-4893 <br />