Laserfiche WebLink
I <br /> to the extent caused by or based upon Contractor's 2. all the Work and materials and equipment <br /> performance of the Work. to be incorporated therein, whether in storage on or <br /> off the Site; and <br /> B. Removal of Debris During Performance of <br /> the Work: During the progress of the Work 3. other property at the Site or adjacent <br /> O Contractor shall keep the Site and other areas free thereto, including trees, shrubs, lawns, walks, pave- <br /> from accumulations of waste materials, rubbish, and ments, roadways, structures, utilities, and Under- <br /> other debris. Removal and disposal of such waste ground Facilities not designated for removal, reloca- <br /> I materials, rubbish, and other debris shall conform to tion, or replacement in the course of construction. <br /> applicable Laws and Regulations. <br /> B. Contractor shall comply with all applicable <br /> C. Cleaning: Prior to Substantial Completion Laws and Regulations relating to the safety of <br /> I of the Work Contractor shall clean the Site and the <br /> Work and make it ready for utilization persons or property, or to the protection of persons <br /> tion by Owner. At or property from damage, injury, or loss; and shall <br /> the completion of the Work Contractor shall remove erect and maintain all necessary safeguards for <br /> I from the Site all tools, appliances, construction such safety and protection. Contractor shall notify <br /> equipment and machinery, and surplus materials owners of adjacent property and of Underground <br /> and shall restore to original condition all property not Facilities and other utility owners when prosecution <br /> designated for alteration by the Contract of the Work may affect them, and shall cooperate <br /> I Documents. with them in the protection, removal, relocation, and <br /> replacement of their property. <br /> D. Loading Structures: Contractor shall not <br /> load nor permit any part of any structure to be C. All damage, injury, or loss to any property <br /> I loaded in any manner that will endanger the referred to in Paragraph 6.13.A.2 or 6.13.A.3 <br /> structure, nor shall Contractor subject any part of the caused, directly or indirectly, in whole or in part, by <br /> Work or adjacent property to stresses or pressures Contractor, any Subcontractor, Supplier, or any <br /> I that will endanger it. other individual or entity directly or indirectly em- <br /> ployed by any of them to perform any of the Work, or <br /> 6.12 Record Documents anyone for whose acts any of them may be liable, <br /> shall be remedied by Contractor (except damage or <br /> I A. Contractor shall maintain in a safe place loss attributable to the fault of Drawings or <br /> at the Site one record copy of all Drawings, Specifications or to the acts or omissions of Owner <br /> Specifications, Addenda, Change Orders, Work or Engineer or , or anyone employed by any of them, <br /> 1 Change Directives, Field Orders, and written <br /> interpretations and clarifications or anyone for whose acts any of them may be liable, <br /> fications in good order and and not attributable, directly or indirectly, in whole or <br /> annotated to show changes made during construc- in part, to the fault or negligence of Contractor or <br /> tion. These record documents together with all any Subcontractor, Supplier, or other individual or <br /> approved Samples and a counterpart of all approved entity directly or indirectly employed by any of them). <br /> Shop Drawings will be available to Engineer for <br /> reference. Upon completion of the Work, these D. Contractor's duties and responsibilities <br /> I record documents, Samples, and Shop Drawings will <br /> be delivered to Engineer for Owner. for safety and for protection of the Work shall <br /> continue until such time as all the Work is completed <br /> and Engineer has issued a notice to Owner and <br /> 6.13 Safety and Protection Contractor in accordance with Paragraph 14.07.B <br /> that the Work is acceptable (except as otherwise ex- <br /> A. Contractor shall be solely responsible for pressly provided in connection with Substantial <br /> initiating, maintaining and supervising all safety Completion). <br /> I precautions and programs in connection with the <br /> Work. Contractor shall take all necessary 6.14 Safety Representative <br /> precautions for the safety of, and shall provide the <br /> necessary protection to prevent damage, injury or A. Contractor shall designate a qualified and <br /> Iloss to: experienced safety representative at the Site whose <br /> duties and responsibilities shall be the prevention of <br /> 1. all persons on the Site or who may be accidents and the maintaining and supervising of <br /> affected by the Work; safety precautions and programs. <br /> I <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright C 2002 National Society of Professional Engineers for EJCDC. All rights resented. <br /> I00700-23 <br /> 04/08 Final Version 05-4893 <br />