I
<br /> to the extent caused by or based upon Contractor's 2. all the Work and materials and equipment
<br /> performance of the Work. to be incorporated therein, whether in storage on or
<br /> off the Site; and
<br /> B. Removal of Debris During Performance of
<br /> the Work: During the progress of the Work 3. other property at the Site or adjacent
<br /> O Contractor shall keep the Site and other areas free thereto, including trees, shrubs, lawns, walks, pave-
<br /> from accumulations of waste materials, rubbish, and ments, roadways, structures, utilities, and Under-
<br /> other debris. Removal and disposal of such waste ground Facilities not designated for removal, reloca-
<br /> I materials, rubbish, and other debris shall conform to tion, or replacement in the course of construction.
<br /> applicable Laws and Regulations.
<br /> B. Contractor shall comply with all applicable
<br /> C. Cleaning: Prior to Substantial Completion Laws and Regulations relating to the safety of
<br /> I of the Work Contractor shall clean the Site and the
<br /> Work and make it ready for utilization persons or property, or to the protection of persons
<br /> tion by Owner. At or property from damage, injury, or loss; and shall
<br /> the completion of the Work Contractor shall remove erect and maintain all necessary safeguards for
<br /> I from the Site all tools, appliances, construction such safety and protection. Contractor shall notify
<br /> equipment and machinery, and surplus materials owners of adjacent property and of Underground
<br /> and shall restore to original condition all property not Facilities and other utility owners when prosecution
<br /> designated for alteration by the Contract of the Work may affect them, and shall cooperate
<br /> I Documents. with them in the protection, removal, relocation, and
<br /> replacement of their property.
<br /> D. Loading Structures: Contractor shall not
<br /> load nor permit any part of any structure to be C. All damage, injury, or loss to any property
<br /> I loaded in any manner that will endanger the referred to in Paragraph 6.13.A.2 or 6.13.A.3
<br /> structure, nor shall Contractor subject any part of the caused, directly or indirectly, in whole or in part, by
<br /> Work or adjacent property to stresses or pressures Contractor, any Subcontractor, Supplier, or any
<br /> I that will endanger it. other individual or entity directly or indirectly em-
<br /> ployed by any of them to perform any of the Work, or
<br /> 6.12 Record Documents anyone for whose acts any of them may be liable,
<br /> shall be remedied by Contractor (except damage or
<br /> I A. Contractor shall maintain in a safe place loss attributable to the fault of Drawings or
<br /> at the Site one record copy of all Drawings, Specifications or to the acts or omissions of Owner
<br /> Specifications, Addenda, Change Orders, Work or Engineer or , or anyone employed by any of them,
<br /> 1 Change Directives, Field Orders, and written
<br /> interpretations and clarifications or anyone for whose acts any of them may be liable,
<br /> fications in good order and and not attributable, directly or indirectly, in whole or
<br /> annotated to show changes made during construc- in part, to the fault or negligence of Contractor or
<br /> tion. These record documents together with all any Subcontractor, Supplier, or other individual or
<br /> approved Samples and a counterpart of all approved entity directly or indirectly employed by any of them).
<br /> Shop Drawings will be available to Engineer for
<br /> reference. Upon completion of the Work, these D. Contractor's duties and responsibilities
<br /> I record documents, Samples, and Shop Drawings will
<br /> be delivered to Engineer for Owner. for safety and for protection of the Work shall
<br /> continue until such time as all the Work is completed
<br /> and Engineer has issued a notice to Owner and
<br /> 6.13 Safety and Protection Contractor in accordance with Paragraph 14.07.B
<br /> that the Work is acceptable (except as otherwise ex-
<br /> A. Contractor shall be solely responsible for pressly provided in connection with Substantial
<br /> initiating, maintaining and supervising all safety Completion).
<br /> I precautions and programs in connection with the
<br /> Work. Contractor shall take all necessary 6.14 Safety Representative
<br /> precautions for the safety of, and shall provide the
<br /> necessary protection to prevent damage, injury or A. Contractor shall designate a qualified and
<br /> Iloss to: experienced safety representative at the Site whose
<br /> duties and responsibilities shall be the prevention of
<br /> 1. all persons on the Site or who may be accidents and the maintaining and supervising of
<br /> affected by the Work; safety precautions and programs.
<br /> I
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright C 2002 National Society of Professional Engineers for EJCDC. All rights resented.
<br /> I00700-23
<br /> 04/08 Final Version 05-4893
<br />
|