My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Owner in exercising the rights and remedies under ments to protect Owner's interest therein, all of <br /> this Paragraph 13.09 will be charged against which must be satisfactory to Owner. <br /> I Contractor, and a Change Order will be issued <br /> incorporating the necessary revisions in the Contract 2. Beginning with the second Application for <br /> Documents with respect to the Work; and Owner Payment, each Application shall include an affidavit <br /> I shall be entitled to an appropriate decrease in the of Contractor stating that all previous progress <br /> Contract Price. If the parties are unable to agree as payments received on account of the Work have <br /> to the amount of the adjustment, Owner may make a been applied on account to discharge Contractor's <br /> Claim therefor as provided in Paragraph 10.05. Such legitimate obligations associated with prior <br /> I <br /> claims, costs, losses and damages will include but Applications for Payment. <br /> not be limited to all costs of repair, or replacement of <br /> work of others destroyed or damaged by correction, 3. The amount of retainage with respect to <br /> I removal, or replacement of Contractor's defective <br /> Work. progress payments will be as stipulated in the <br /> Agreement. <br /> D. Contractor shall not be allowed an exten- B. Review of Applications <br /> I sion of the Contract Times because of any delay in <br /> the performance of the Work attributable to the 1. Engineer will, within 10 days after receipt <br /> exercise by Owner of Owner's rights and remedies of each Application for Payment, either indicate in <br /> I under this Paragraph 13.09. writing a recommendation of payment and present <br /> the Application to Owner or return the Application to <br /> Contractor indicating in writing Engineer's reasons <br /> ARTICLE 14- PAYMENTS TO CONTRACTOR AND for refusing to recommend payment. In the latter <br /> I COMPLETION case, Contractor may make the necessary <br /> corrections and resubmit the Application. <br /> I 14.01 Schedule of Values 2. Engineer's recommendation of any pay- <br /> ment requested in an Application for Payment will <br /> A. The Schedule of Values established as constitute a representation by Engineer to Owner, <br /> provided in Paragraph 2.07.A will serve as the basis based on Engineer's observations on the Site of the <br /> I for progress payments and will be incorporated into executed Work as an experienced and qualified <br /> a form of Application for Payment acceptable to design professional and on Engineer's review of the <br /> Engineer. Progress payments on account of Unit Application for Payment and the accompanying data <br /> 1 Price Work will be based on the number of units and schedules, that to the best of Engineer's <br /> completed. knowledge, information and belief: <br /> 14.02 Progress Payments a. the Work has progressed to the point <br /> I <br /> indicated; <br /> A. Applications for Payments <br /> b. the quality of the Work is generally in <br /> 1 1. At least 20 days before the date estab- <br /> lished in the Agreement for each progress payment (subject to an evaluation of the Work as a <br /> (but not more often than once a month), Contractor functioning whole prior to or upon <br /> shall submit to Engineer for review an Application for Substantial Completion, to the results of any <br /> Payment filled out and signed by Contractor subsequent tests called for in the Contract <br /> covering the Work completed as of the date of the Documents, to a final determination of <br /> Application and accompanied by such supporting quantities and classifications for Unit Price <br /> 1 documentation as is required by the Contract Docu- <br /> ments. If payment is requested on the basis of other qualifications stated in the <br /> materials and equipment not incorporated in the recommendation); and <br /> Work but delivered and suitably stored at the Site or <br /> I at another location agreed to in writing, the Applica- c. the conditions precedent to Contractors <br /> lion for Payment shall also be accompanied by a bill being entitled to such payment appear to <br /> of sale, invoice, or other documentation warranting have been fulfilled in so far as it is <br /> 1 that Owner has received the materials and equip- Engineer's responsibility to observe the <br /> ment free and clear of all Liens and evidence that Work. <br /> the materials and equipment are covered by <br /> appropriate property insurance or other arrange- <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright©2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> I00700-38 <br /> 04108 Final Version 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.