My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION 00800 <br /> 1 FIRST AMENDED SUPPLEMENTARY CONDITIONS <br /> The following supplements modify, change from or add to the Standard General Conditions of <br /> 1 the Construction Contract, EJCDC Document 1910-8, 1996 Edition. Where any Article of the <br /> General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified <br /> or deleted by these supplements, the unaltered provisions shall remain in effect. <br /> ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br /> Add the following sentence to Paragraph 1.01.28 entitled "Notice of Award": <br /> 1 "When requested by OWNER, the Notice of Award may be issued by the <br /> ENGINEER." <br /> 1 Add the following sentence to Paragraph 1.01.29 entitled "Notice to Proceed": <br /> 1 'When requested by OWNER, the Notice to Proceed may be issued by <br /> ENGINEER." <br /> 1 Add the following terms after Paragraph 1.01 50: <br /> 1.51 ARCHITECT/ENGINEER - The person, firm or corporation named as the <br /> 1 ENGINEER in the Agreement. <br /> 1.52 Provide - As used in the Project Manual, means to furnish and install, <br /> 1 complete and ready for intended use. <br /> 1.53 Product - As used in the Project Manual, includes materials, fabrications, <br /> systems and equipment. <br /> 1 1.54 Project Manual - The volume of written construction documents, including <br /> the Bidding Documents, sample forms, and the Contract Documents, such as the <br /> 1 Conditions of the Contract and the Specifications. <br /> 1.55 Retainage — The percentage of the Contract Price, retained by Owner from <br /> the progress payments to the Contractor for Work performed until the Work is <br /> completed. It shall be payable to Contractor in accordance with the Contract <br /> Documents. <br /> 1 ARTICLE 2 -PRELIMINARY MATTERS <br /> 1 Add the following to Paragraph 2.01: <br /> "If the Work is to be commenced prior to execution of the Agreement in response <br /> 1 to a letter of intent, CONTRACTOR shall, prior to commencement of the Work, <br /> submit evidence satisfactory to OWNER that such bonds will be furnished." <br /> 1 <br /> 1 05/08 Final Version 00800-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.