My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quality Communications Fire & Security
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Quality Communications Fire & Security
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2013 1:22:03 PM
Creation date
3/22/2013 1:21:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling System at SI Gov. Center
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. OVERVIEW <br /> Pursuant to having reviewed the design we here at Quality Communications, Fire & <br /> Security are pleased to propose an alternative solution to the cable plant infrastructure <br /> design. <br /> We have been a certified installer of Berktek/Ortronics cabling systems since 1996, (see <br /> Tab 3). <br /> In as much as your statement of work. (SOW) permits the substitution of equal products <br /> in all aspects of the cable plant design where permissible, this would facilitate a complete <br /> end to end 25 year warranty of the entire cable plant infrastructure under the umbrella of <br /> one warranty solution. <br /> In review of your plans and specifications, we have provided a design solution based <br /> upon the network design information provided and our proposal will include a Siecor <br /> fiber optic backbone solution as well since there was no clarification of an equal to their <br /> products in your design statements. <br /> I have provided a typical communications equipment room detail, (see Tab 3) within this <br /> section. This displays the complete equipment rack layout to include a total data and <br /> voice solution including data and voice runs, data rack, 110 blocks and entrance <br /> protection for the voice cable at the access provider, (AP) point within the <br /> ® telecommunications closet. This attachment is in no way representative of your final <br /> design layout or components but merely indicates the level of our expertise to provide a <br /> fully documented design solution. <br /> 5. SUMMATION <br /> Pursuant to your requirements and in junction with Section 2.1 I have enclosed a detailed <br /> list of projects and customers which currently have existing and or on-going relationships <br /> with our company, (see Tabs 5 and 6). <br /> In conclusion, this proposal comprises a complete communications infrastructure system <br /> to include all associated distribution and backbone cabling, terminations, rack and patch <br /> panel equipment, pathways and all necessary hardware for a total turnkey solution., LAW <br /> • your specifications. <br /> We Look forward to earning your business. <br />
The URL can be used to link to this page
Your browser does not support the video tag.