Laserfiche WebLink
<br />9. Can wire brushing be substituted for water jetting to clean existing steel casing? <br /> <br />Response: Wire brushing can be substituted for water jetting to clean the existing steel casing. <br /> <br /> <br />10. Regarding well cleaning. <br />Common industry practice for cleaning stormwater wells in South Florida is to circulate water back <br />to the well this provides sediment control while limiting impact to road traffic and residents. Typically <br />drill rods are used to drill each well back to original depth utilizing flooded reverse air drilling <br />method. Sand and debris will settle in the drillers sludge tank while continuously circulating water <br />back to the well/well box. Used in conjunction with mechanical surging produces tremendous gains <br />in capacity. Can this method be used for the well cleaning? <br /> <br />Response: Yes, above described method can be used. <br /> <br /> <br />11. Pay Item #15 <br />Design-Build services that may include but not limited to engineering design, testing, permitting <br />with all applicable agencies, materials, labor, and equipment to convert selected drainage wells to <br />injection wells. <br /> <br />There is not enough available information at this time to price alternate item #15. We recommend <br />the city includes an allowance for this item. <br /> <br />Response: Alternate 15 is excluded. Contractors are not required to provide bid for this alternate <br />15. Upon further investigation, should the addition of injection wells be deemed necessary, <br />further negotiations will be conducted with successful contractor. <br /> <br /> <br />12. Section 03500 Section 3.2 Part E <br />E. The CONTRACTOR shall employ Best Management Practices (BMPs) to mitigate potential <br />turbidity and/or solids from entering any surface water body receiving discharge water. The <br />CONTRACTOR shall install and maintain silt booms, curtains, or other means required to protect <br />any surface water body receiving the discharge water. Surface water receiving discharge water <br />shall not exceed 29 nephelometric turbidity units (NTU) above background conditions. Where <br />applicable, the CONTRACTOR shall maintain appropriate water quality monitoring records <br />demonstrating compliance with turbidity requirements in the receiving water body. <br /> <br />a. Biscayne Bay is a protected body of water. Water quality standards to discharge into the <br />bay are very difficult to impossible to attain. Can we assume that development discharge <br />will go into nearby wells? <br /> <br />Response: Yes. Please refer to response #9. <br /> <br />b. What is the protocol for development water if the 29NTU standard is not reached? The wells <br />North Bay Road Drainage Improvements <br />Invitation to Bid No. 18-04-01 <br />Response to Questions Page 3 <br /> <br />