Laserfiche WebLink
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> Michael A:Lee, Estimator ' . <br /> Mr. Lee, a 23-year veteran of Ceres Environmental Services, Inc., provides quality control and projectIII <br /> management to the company's heavy civil projects, including recent work on the reconstruction and repair <br /> to Louisiana levees breached by Hurricane Katrina storm surges and flooding. Mr. Lee is responsible for <br /> procurement of project task costs and preparation of bids for a variety of Ceres projects, including UST <br /> removal and installation, environmental consulting, environmental mitigation/restoration, levee installation <br /> and repair, erosion control/stabilization, earthwork, construction, and disaster related emergency work. Mr. <br /> Lee has experience with selective land clearing and demolition projects, including asbestos, lead, and PCB <br /> abatement. He is also responsible for environmental regulatory compliance expertise and construction <br /> quality control management. <br /> PROFESSIONAL EXPERIENCE <br /> • Kuykendahl Detention Basin 2015-current: Chief estimator providing production analysis <br /> calculations, project cost analysis, and sub quote analysis. <br /> • Falgout Canal Road Levee Segment 2015-current: Chief estimator providing production analysis <br /> calculations, project cost analysis, and sub quote analysis. <br /> • Ward 7 Levee Improvement and Extension 2014-current: Chief estimator providing production <br /> analysis calculations, project cost analysis, and sub quote analysis. j <br /> • Reach G 2-b and Reach G 2-c Earthen Levees 2014-current: Chief estimator providing <br /> production analysis calculations, project cost analysis, and sub quote analysis. <br /> o Reach H-1 Levee 2013-2016: Chief estimator providing production analysis calculations, project <br /> cost analysis, and sub quote analysis. <br /> ■ Reach F Earthen Levee 2013-2015: Chief estimator for Reach F levee which involved construction <br /> of earthen levee with floodgate structures. Provided production analysis calculations and project <br /> cost and sub-quote analyses. <br /> • Birdland Park Levee Improvements 2010-2012: Quality Control and administrative support to <br /> levee improvement project in Des Moines, Iowa. Work included increasing the levee's height, <br /> constructing six gatewells, and modifying existing pump stations to accommodate the new <br /> 0 <br /> dimensions. <br /> • Flood Control, Little Calumet River 2009-2011, Quality Control and administrative support to <br /> Calumet River Flood Control project which includes tree clearing and construction'of a levee in <br /> Indiana <br /> m Flood Control, Rio Puerto Nuevo, Rio Fajardo 2007, Quality Control and management support <br /> to Floodway Control project which included river channelization and levee construction in Puerto <br /> Rico <br /> • Hurricane Katrina 2005, Project Management to emergency levee repair and construction of <br /> approximately 12 miles of levees to Lake Ponchartrain and Plaquemines Parish, Louisiana <br /> • U.S. Army Corps of Engineers, Sulphur River 2005, Project management, supervision, and <br /> quality control of excavation and environmental restorations to water control project including <br /> installation of pumps, soil treatment, and extraction remediation systems <br /> • U.S. Army Corps of Engineers,Trinity River 2004, Quality Control and administrative support to <br /> Trinity River Dallas Floodway Extension project which included the excavation and construction of <br /> swales, wetland, levees, and flood conveyance in Texas <br /> EDUCATION/CERTIFICATIONS • <br /> • Bachelor's degree, Geology, University of Minnesota <br /> ® Professional Geologist(MN State License#30377) <br /> • USACE CQM-certified <br /> • OSHA 40-Hour Hazmat Health and Safety <br /> • Lead Abatement Training for Supervisors <br /> • Erosion and Sediment Control Plan Design training <br /> • Ground Water Sampling, Water Well Construction, and Development Procedures training <br /> • <br /> M . Tab 7 Personnel Experience and Qualification <br /> J Section 2 Key Personnel Resumes <br /> ENVIRONMENTAL Page 7.2-16 <br />