My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tidal Basin
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-03 Disaster Debris Monitoring Services Financial Recovery Assistance
>
Responses
>
Tidal Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:01:46 PM
Creation date
5/10/2018 3:56:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Monitoring Svcs Financial Recovery Assist
Bid No. (xx-xx-xx)
18-04-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ �� : RFP No. 18-04-03: Disaster Debris Monitoring Services& Financial Recovery Assistance <br /> .ti <br /> Debris Monitoring Operational Plan Development Checklist <br /> In this checklist,Tidal Basin identifies a typical Operational Plan Checklist to provide the City an example of <br /> the elements and criteria we typically address the development of the Debris Monitoring Operational Plan <br /> (DMOP).This checklist serves as the foundation of the DMOP, delineating specific factors that result in a <br /> well-rounded,comprehensive DMOP that is scalable and adaptable to the size and magnitude of the <br /> event. <br /> 1. PLAN OVERVIEW <br /> 1.1 Plan Overview <br /> 1 1.2 Intent <br /> 1.3 Scope <br /> 2. PLAN ACTIVATION <br /> 2.1 Staff activation <br /> 2.1.1 Mobilization <br /> 2.1.2 Monitoring coordination meeting <br /> 3. OPERATIONAL STRATEGIES AND PROCEDURES <br /> 3.1 Monitoring locations <br /> 3.1.1 Situational awareness <br /> 3.1.2 Debris monitoring <br /> 3.1.3 Monitoring debris processing <br /> 3.2 Coordinating with debris removal contractors <br /> a4. REPORTING <br /> 4.1 Report identification <br /> 4.2 Report formatting <br /> 4.3 Reporting schedule <br /> 4.4 Invoicing format <br /> .4.5 Invoicing schedule <br /> 5. Demobilization <br /> 5.1 Scheduling <br /> 5.2 Monitoring demobilization <br /> 5.3 Site closeout monitoring <br /> 5.4 Closeout <br /> •1 <br /> U <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.