My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Crowder Gulf
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
Crowder Gulf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 9:45:18 AM
Creation date
5/10/2018 4:57:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management and Removal Services
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CROWDER <br /> ® ®® CrowderGulf <br /> ULG <br /> RFP Disaster Debris Management and Disposal Services 18-04-02 <br /> City of Sunny Isles Beach, FL <br /> The City, the monitoring company or CrowderGulf may provide the hot line. Regardless of the method chosen to provide the <br /> information,CrowderGulf is committed to resolving the damage complaint as quickly as possible to the satisfaction of the City and <br /> its citizens.We will employ a Claims Resolution Person(CRP)to handle all property damages that may occur during the recovery <br /> process. If possible, a local resident with excellent communication and negotiating skills will be employed to fill this position. This <br /> person will be tasked with responding to and amicably resolving all incidents that may occur. <br /> Debris Management Site Development <br /> CrowderGulf has vast experience with selecting,developing, managing and operating Temporary Debris Management Sites.We <br /> are committed to efficient and safe DMS operations and require all personnel to be vigilant in using safe practices at all times. In <br /> thecontext of this proposal,the terms"Temporary Debris Separation and Reduction Site"and the term"Debris Management <br /> Site" (DMS)are used interchangeably. <br /> DMS are established when debris cannot be taken directly from the collection point to the final disposition location. A DMS is a <br /> j location to temporarily store, reduce,segregate, and/or process debris before it is hauled to its final disposition. <br /> DMS Site Selection <br /> Site selection is probably the most important decision effecting DMS operations. CrowderGulf will work closely with the City of <br /> Sunny Isles Beach to identify and secure suitable locations. Specific Site Plans will be developed for each DMS either upon <br /> activation or upon request by the City, and will be in compliance with FEMA 325 regulations for site plan development. Once site <br /> selection is approved by the appropriate Debris Managers, CrowderGulf will perform baseline environmental testing protocols as <br /> required and will obtain any required special permits and environmental permissions. All costs associated with the preparation, <br /> operation, and restoration of DMSs is included in CrowderGulfs pricing structure for the contract. <br /> Site selection should be based on the following criteria: <br /> • Ownership <br /> • Potential for Land Lease Agreements <br /> • Size <br /> • Location <br /> ` • Environmental and historic concerns(baseline study findings) <br /> i • Required Permits <br /> DMS Design and Operational Features <br /> The information gathered during the baseline data collection becomes important to the design of the site. The efficiency and the <br /> overall success of the DMS operations are determined by how the site is designed. <br /> 1 A minimum of the following features will be designed into the DMS plan. <br /> • Portable toilet facilities will be conveniently located to serve the inspection towers, crews working on the site, and office <br /> facilities <br /> • Perimeter chain-link fencing,erosion and sediment control fencing, and other necessary drainage control methods <br /> • Site traffic flow will provide for orderly movement of vehicles and equipment to avoid crossing traffic lanes with the construction <br /> of two entrances/exits with lockable gates <br /> • At the request of the City of Sunny Isles Beach,the DMS(s)may be restricted to City and Contractor vehicles only <br /> • Safe and ready access of fire safety and rescue equipment will be provided to all functional sections of the site and to debris <br /> stockpiles <br /> • A Safety Zone of at least 200'will be established around the grinder <br /> • Air Curtain Incinerator(ACI)or Open burning safety zone will be established and will be 1,200'from any structure(other than <br /> inspection tower)and no less than 250'from any other pile or type of debris on site <br /> • Ash storage pit will be adjacent to ACI units <br /> • Compacted crushed rock and/or mulch will be used on ingress/egress road surfaces <br /> • Designated personnel parking area for 30 vehicles will be established <br /> • . Space for two 12'x50' office trailers will be established <br /> • Development of a lined Hazardous Materials Containment Area surrounded by a berm <br /> �i 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.