Laserfiche WebLink
1 <br /> i GULF <br /> CrowderGulf <br /> f i1el'LF RFP Disaster Debris Management and Disposal Services 18-04-02 <br /> City of Sunny Isles Beach, FL <br /> i As soon as critical facility locations are identified, CrowderGulf will dispatch"clearing crews". Depending on the damage, multiple <br /> ; crews will be deployed within 24 hours of receiving a NTP. The "clearing crews" i <br /> will use all available resources with focus on local personnel and firms. These <br /> "clearing crews"at a minimum will consist of: "Perhaps most noteworthy of the <br /> • Two pieces of rubber-tired pushing / loading equipment such as backhoe CrowderGulf team was the selfless <br /> loaders, rubber tired front-end loaders, and skid steer loaders with operators it was partnership tateeyexhibited.t While <br /> it was anticipated that a <br /> ! • Two-three chain saw operators, laborers, flaggers with transport vehicles contractor would seek to profit <br /> • Five 16 to 20 cubic yard capacity dump trucks with drivers from work opportunities,there <br /> I • One Quality Control/Foreman with communications capability and pickup were multiple occasions when the <br /> I 1 truck CrowderGulf team chose not to <br /> • Equipment and resources needed to transport crew from one site to another take advantage of the City and <br /> instead openly expressed that it <br /> To maximize efficiency, the clearing crew may, depending on the size of the Would not be in the City's financial <br /> best interest to take certain <br /> roadway and severity of damage, split into two work teams clearing at different measures that would have actually <br /> locations on the same street or road. If a crew divides into two work teams,visual benefited CrowderGulf.It was this <br /> ! contact and effective radio or cellular communication will be maintained between cooperative attitude that <br /> the teams. convinced us that the City of <br /> Newport News had made the right <br /> When needed,Search and Rescue Support Crews will be provided.At a minimum, decision to make CrowderGulf our <br /> each crew will consist of the following: debris recovery management <br /> • One trackhoe excavator, minimum 150h with operator, company of choice." <br /> � P P <br /> • Three laborers/riggers <br /> One crew foreman Ralph Caldwell,Public Works <br /> • Assistant Director <br /> • Slings, riggings, implements Newport News, VA <br /> • Transport equipment — <br /> II Safety of the clearing crews in this early stage of work will be a paramount concern. Downed power lines,falling trees,equipment <br /> and chain saw injuries, worker fatigue, and a host of unanticipated hazards demand constant attention by all team members. <br /> Therefore,toolbox safety discussions will be a daily requirement for the team.Work areas will be surveyed for hazards before <br /> �; work begins and throughout the clearing operation.Special hazard observation responsibility will be assigned to the Quality Control <br /> Manager. <br /> The following is an example a Debris Response priority list: R �; i, i :r <br /> • Fire, police, and ambulance service routes 1.• ,t k'i ,!/� c, . ,,t `1. , t <br /> { • Access routes to trauma centers, hospitals,critical care units and jails , ° . .i-44,'� . 34`Y <br /> • Major arterial routes `1 ', i ' t �.- .�� i::.A"'• <br /> • Roads and streets to the emergency operations center 4E � <br /> • Supply routes to emergency supply distribution centers ` 'itt -; .�r Fth <br /> • ;11 s � `-,: z <br /> Roads and streets to government facilities , <br /> • Communication towers and systems access„ , fr _, �.x <br /> • Utility access routes ,J v <br /> l --t, <br /> • Routes to shelters _ _ _ ', _ T � '', <br /> I • Routes to the debris management centers <br /> All other roads and streets are normally cleared as soon as the emergency and major access routes are opened and the City <br /> transitions to the recovery operations. <br /> I <br /> a <br /> 1 <br /> II <br /> i <br /> II61 <br />