Laserfiche WebLink
1 <br /> ingress for use by company inspector and Government inspector,one tower at the point of egress to ensure all <br /> debris hauling trucks are in fact empty upon leaving the site, one tower may be utilised if ingress and egress <br /> point is the same.The egress tower shall be manned by at least a representative of DRC. <br /> • Traffic Controls - Traffic control personnel, with appropriate traffic control safety equipment, will be <br /> stationed at the ingress observation tower to maintain vehicular and pedestrian traffic control. Additional <br /> traffic control personnel will be stationed throughout the site, as needed, to enforce proper dumping and <br /> prevent personal injury to ensure compliance with the Corporate Accident Prevention Plan as part of the <br /> Corporate Safety Plan. <br /> • Clearing and Grading - Clearing and grading of debris staging sites will be accomplished, to the level <br /> required,in accordance with the site management plan and task order from The City of Sunny Isles Beach. <br /> • Environmental Protection - DRC's "Environmental Protection Plan" will be followed to ensure compliance <br /> with required standards (Clean Water Act, Storm Water Act, Resource Conservation and Recovery Act, <br /> III <br /> Superfund Amendments, Reauthorization Act and others). The plan outlines procedures concerning erosion <br /> control,hazardous and toxic wastes and dust and smoke control and is available for review upon request. <br /> DEBRIS STORAGE AREA <br /> Debris will be segregated into 5 main areas of concern as follows unless otherwise instructed by the Government: <br /> VEGETATIVE DEBRIS <br /> IVegetative debris will be cleaned of C&D debris to the extent possible to facilitate compliance with requirements for <br /> reduction of vegetative debris. <br /> IIICONSTRUCTION AND DEMOLITION(C&D)DEBRIS <br /> C&D debris will be dampened prior to dumping and periodically as needed,to comply with Local,State and Federal <br /> EPA standards. <br /> 1 RECYCLABLE/SALVAGE <br /> Il Recyclable/salvageable materials will be stock piled in accordance with Government task order. <br /> WHITE GOODS <br /> White goods will be stock piled in accordance with Government task order. <br /> I, <br /> HAZARDOUS AND/OR TOXIC WASTES(HEW) <br /> HTW will be segregated and stored in a Government approved containment area. All site personnel will receive a <br /> safety briefing regarding operations involving HTW to prevent personal injury and ensure compliance with the <br /> Corporate Accident Prevention Plan as part of the Corporate Safety Plan. HTW containment site perimeter will be <br /> posted and secured for personnel safety. <br /> DEBRIS REDUCTION METHODS <br /> GRINDING AND/OR CHIPPING OPERATIONS <br /> Grinding/Chipping is DRC's preferred debris reduction method,as it encourages resource conservation through the <br /> salvage of wood chips for renewable energy.All vegetative debris will be reduced through grinding and/or chipping, <br /> rather than by burning operations. <br /> IAlthough this operation is preferred for environmental purposes, however, it is the most time consuming and costly <br /> reduction method due to material handling, hauling and disposal costs after grinding and/or chipping operations <br /> I have been accomplished. Grinding and/or chipping operations of C&D materials are prohibited by and within <br /> numerous jurisdictions. Grinding and/or chipping operations will be accomplished on the type of debris(vegetative <br /> �a <br /> DRC Emergency Services,LLC 63 ��EnERCENcr SERVICES <br /> 0RFP No.18-04-02 Strilam Bad. <br />