Laserfiche WebLink
I <br /> I 2010 Modular Camp Housing Units& Each has a serial# <br /> Housing Offices 13 <br /> 2011 MOD Sleeping Camp MOD Sleeping Each has a serial# 27 <br /> 1 2011 MODCamp Gym Each has a serial# <br /> 2011 MOD Gym Camp MOD Gym Each has a serial# <br /> 2011 MOD Laundry Camp Laundry Each has a serial# <br /> 1 2011 MOD Laundry Camp MOD Laundry . Each has a serial# <br /> 2011 Storage Bldg Camp Storage Bldg Each has a serial# <br /> 1 Office Trailers 2 <br /> 2008 EZ Rigid Trailer EZR-8624 Portable Office Trailer 1E9BR241781434001 <br /> 2008 EZ Rigid Trailer EZR-8624 Portable Office Trailer 1E9BR241781434002 <br /> 1 Detention Unit/Portable Jail 8 <br /> 2011 Portable Jail 40' Portable Jail 40 ft.Portable Jails 2 x 7 See#267-272 <br /> man <br /> 1 2011 Portable Jail 40' Portable Jail . sleepers,one 6 man sleeper See#267-272 <br /> 2011 Portable Jail 40' Portable Jail 2 man holding area,one See#267-272 <br /> with <br /> 2011 Portable Jail 40' Portable Jail . shower&toilet unit,and oSee#267-272 <br /> 2011 Portable Jail 40' Portable Jail day rooms-all stainless See#267-272 <br /> 1 2011 Portable Jail 40' Portable Jail new in August,2011 See#267-272 <br /> 2009 Port City 24'Custom Trailer Prison Trailer 4PCCU242191000016 AL 2TR13265 <br /> Detention Unit 8x20x8'6" Portable Jail <br /> 1 <br /> SUBCONTRACTORS <br /> DRC maintains a cadre of hundreds of subcontractors of which approximately thirty are primary subcontractors that <br /> have been used in all of DRC's responses to major events within the last twenty-nine years. These subcontractors <br /> along with DRC's own personnel and equipment are capable of mobilizing an event of huge magnitude.For instance, <br /> Iin 2008 while responding to the aftermath of Hurricane like in Louisiana and Texas,DRC operated and managed over <br /> 2000 pieces of equipment. DRGs advanced team was imbedded in emergency operations centers throughout these <br /> two States and was functioning at eighty percent capacity within seventy-two hours of the notices to proceed. The <br /> event encompassed the collection, processing, recycling and disposal of over eleven million cubic yards of debris, all <br /> of which was performed in just ninety days. <br /> 1 ABILITY TO MANAGE MULTIPLE CONTRACTS <br /> DRC has implemented a comprehensive Corporate Level Advance Mobilization Plan to ensure a coordinated, <br /> expeditious and effective response to disasters by its personnel and resources. This plan has been utilized by DRC to <br /> respond quickly in the following contracts: <br /> 2017 HURRICANE IRMA <br /> I • DRC was activated in 26 jurisdictions simultaneously while managing 13 debris management sites. DRC <br /> anticipates removing over debris over 4,000,000 cubic yards of debris. <br /> 1 2017 HURRICANE HARVEY <br /> • DRC was activated in 17 jurisdictions following Hurricane Harvey and simultaneously ran more than 16 <br /> debris management sites during this activation. <br /> • DRC has recovered and reduced over 2,750,000 cubic yards of debris to date. <br /> .a <br /> DRC Emergency Services,LLC 76 ��EY E.4EMCY SERVICES <br /> RFP No.18 04 02 -- Sulking Back. <br />