My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TFR Enterprises
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
TFR Enterprises
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:58:18 PM
Creation date
5/11/2018 10:37:25 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management and Removal Services
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.F.H. Enr rises, Inc. <br /> p <br /> DISASTER RESPONSE DIVISION <br /> 4111 Company Information <br /> 1. Name of Company: TFR Enterprises, Inc <br /> 2. Headquarters and local branch locations: <br /> 601 Leander Drive <br /> Leander, TX 78641 <br /> *TFR does not have a location in Sunny Isles Beach however, if activated we <br /> would set up a temporary office location. <br /> 3. Web Address: www.tfrinc.com <br /> 4. Business Structure: Incorporated in Tennessee <br /> 5. Date Founded: 6/12/1989 <br /> 6. Headquarters Telephone: (512) 260-3322 ext. 200 <br /> 7. Proof of Insurance: Please see enclosed Certificate of Insurance <br /> 8. Mobilization Plan: <br /> 72 -hours prior to landfall of the event: <br /> The Operations Manager will alert all employees of disaster team of the impending event and <br /> have them begin preliminary personnel preparations for 48-hour notice of departure. <br /> The Operations Manager will notify the County of the designated TFR response team's point of <br /> contact and provide them with a 24-hour immediate phone number. <br /> A Senior Project manager will be dispatched to an area within a few hours of the event location <br /> and establish a temporary staging and deployment area located within a few hours of the event <br /> location, to be used for temporary staging equipment and personnel during the 24-48 hours <br /> preceding the event. <br /> 48 -hours prior to landfall of the event: <br /> TFR Equipment Management Officer will have already mobilized TFR owned equipment to a <br /> temporary staging area located outside the Forecasted Cone for landfall of the storm. <br /> Upon receiving notice from the contracting agency or at the discretion of the Operations <br /> Manager, TFR will transport its resources (equipment and manpower) toward the anticipated <br /> landing area so that equipment and personnel are within a few hours reach of the anticipated <br /> "strike" location. <br /> Equipment to be mobilized <br /> The type and numbers of equipment to be mobilized will be based upon the characteristics and <br /> strength of the storm. For example, if predominately wind damage is anticipated certain <br /> resources will be needed, and if rainfall and flooding damage is anticipated, a different schedule <br /> of equipment will be necessary. TFR anticipates that the minimum equipment to be mobilized <br /> would be: <br /> • Rubber-Tired Wheel Loaders 4 <br /> • Dozers/Track Loaders 4 <br /> • Skid Steers 4 <br /> • Self-Loader/Knuckle-boom Trucks 10-15 <br /> ® • Bucket Trucks 5-10 <br /> ® • Tub Grinders(if needed) 2 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.