My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2036
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2013 4:51:33 PM
Creation date
3/22/2013 4:45:23 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2036
Date (mm/dd/yyyy)
03/21/2013
Description
3rd Amendment to Design-Build Agmt w/4M Investors, Gateway Park Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> March 6, 2013 <br /> Memorandum <br /> Verbal agreement between-Jose Milton (4M-investors) and Honorable <br /> Mayor Norman Edelcup (City Mayor). <br /> Jose Milton agrees in a reduction of the total price.of the new.contract-of <br /> $1,225,000.00 for a total including the new design fees of the new project for a <br /> total of $17,440,000:00. The $440,000.00.over $17;000,000.00 is the additional <br /> cost for the metal panels of the garage $423,813.70 submitted to the City on <br /> February 20, 2013 plus 4% increase, It makes'$440;000.00. Additional donation <br /> made when the. City ordered Breaking Grotind Of project, 800 lineal feet of <br /> decorative fence cost of$120,000.00 previously requested by theCity. <br /> Previous reduction requested by Hon. Mayor Edelcup (2nd Amendment) for <br /> stage park and garage 5% total cost. This reduction now of $1,225,000.00 is <br /> approximately 6.5% of total cost make a total reduetion for the project of 11.5%. <br /> Second donation that will be made to. the City by Jose Milton is the <br /> Pedestrian Bridge at cost if the City gives to the Architect the information <br /> - et t. start design Of the Pedestrian Bridge. The City needs to have FPL, <br /> k h4 FDOT, and Plaza of America negotiations completed within 90 days after the <br /> r1�d construction commences on the park/garage or by January '1,. 2014, whichever <br /> comes first. <br /> Definition of cost: Purchase cost of labor or material plus 10% overhead <br /> cost which.is the minimum in the industry. Nobody charges less than 10%. It will <br /> be zero profit to.Contractor. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.