My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEWETT-KIER CONSTRUCTION, INC. <br /> Building Experience Form <br /> 1. Name and location of project: u. s. CUSTOMS HANGAR&ADMINISTRATION FACILITY, <br /> HOMESTEAD ARB,FL <br /> 2. Nature of firm's responsibility on this project: (markonly one box) <br /> Construction Manager at-risk (with Gurantee Maximum Price) <br /> General Contractor ❑ Construction Manager <br /> LI Design - Build ❑ Other <br /> 3. Project owner's representative (architect or engineer): <br /> Name: DEPARTMENT of THE TREASURY <br /> Address: 1301 CONSTITUTION AVENUE,WASHINGTON,DC 20229 <br /> Current phone Number: ( 202 ) 927-0072 <br /> 4. Project user/agency's representative (owner): <br /> Name: U. S.CUSTOMS SERVICE <br /> Address: 1301 CONSTITUTION AVENUE,WASHINGTON,DC 20229 <br /> Current phone Number ( 202 ) 927-0072 <br /> 5. Date project was completed or is anticipated to be completed 5 / 1 / 97 <br /> 6. Size of project (Gross square footage of construction):75.000 qsf <br /> 7. Cost of project (Construction cost):Si 9,026,205.00 <br /> 8. Work for which the staff (employees) was responsible: General Conditions,Concrete, Carpentry, <br /> Doors,Hardware, and all Specialties. <br /> 9. Present status of this project:coMPLLIED <br /> 1 0. P. M. and other key professionals involved on listed project: (Check box if assigned to this project) <br /> HEWETT, <br /> PROJECT MANAGER EXECUTIVE � JOHN MAYER, ESTIMATOR/SCHEDULING <br /> CEI WILLIAM O AKMAN <br /> FREDERICK E. McINTOSH, SUPERINTENDENT Li <br /> Revised June 30.1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.