My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEWETT-KIER CONSTRUCTION, INC. <br /> ® Building Experience Form <br /> 1. Name and location of project: SUGAR SAND PARK, PHASE 3, 300 MILITARY TRAIL, CAMINO <br /> REAL,BOCA RATON, FLORIDA 33432 <br /> 2. Nature of firm's responsibility on this project: (mark only one box) <br /> ji Construction Manager at-risk (with Gurantee Maximum Price) <br /> General Contractor ❑ Construction Manager <br /> (i Design - Build ❑ Other <br /> 3. Project owner's representative (architect or engineer): <br /> Name: SCHWAB,TWITTY,HANSRARCHrIEGTs <br /> Address: Northbridge Center,515 North Flagler Drive,Suite#1400,W.Palm Beach,FL 33401 <br /> Current phone Number ( 561 ) 832-5599 <br /> 4. Project user/agency's representative (owner): <br /> Name: GREATER BOCA RATON TAX DISTRICT,FLORIDA <br /> Address: 300 SOUTH MILITARY TRAIL,BOCA BATON,FLORIDA 33486 <br /> Current phone Number: ( 561 ) 417-4599 <br /> 5. Date project was completed or is anticipated to be completed 9 / 13 / 98 <br /> 6. Size of project (Gross square footage of construction): 53,329 qsf <br /> 7. Cost of project (Construction cost): $ 6,988,071.00 <br /> 8. Work for which the staff (employees) was responsible: Concrete Work, Carpentry,Hollow Metal, <br /> Hardware,and all Specialties. <br /> 9. Present status of this project: COMPLETED <br /> 1 0. P. M. and other key professionals involved on listed project: (Check box rf assigned to this project)PROJECT ECUTIVE <br /> ® El WILLIAM OLAKMAN,PROJECT MANAG R JOHN MAYER, ESTIMATOR/SCHEDULING <br /> El BRIAN DUCHARME,SUPERINTENDENT <br /> Revised June 30.1999' <br />
The URL can be used to link to this page
Your browser does not support the video tag.