|
CONSTRUCTION. :NC. SODCOST TRRU 3/33/98 3
<br /> 4/28/98
<br /> 10:08:16
<br /> ORIGINAL CURRENT CURRENT :CAL t BALAN=E TO
<br /> BUDGET BUDGET 005:5 COSTS CCMPL CC*G'LETION
<br /> TOT 24.248.00 24,248.00 0.00 0.90 24,248.00
<br /> 1305 ACCESS DOORS
<br /> 3-M 500.00 500.00 0.00 0.30 5CC.00
<br /> 4-L 500.03 500.00 0.00 0.30 500.00
<br /> TOT 1,000.00 1,000.00 0.0C 0.30 1,003.00
<br /> 1330 CO:LING DOORS 4 GRILSES
<br /> 6-5 33,229.00 33,229.00 0.00 0.30 33,229.00
<br /> TOT 33,229.00 33.229.00 0.0C 0.30 31,229.00
<br /> 1500 WINDOWS
<br /> 6-5 63,300.00 64,900.00 5.00 0.30 64,9[3.0[
<br /> TOT 63,300.00 64,900.00 0.0C 0.33 64,903.00
<br /> 8668 SIORM SHUITE1S/PANE3S
<br /> 6-5 10,779.00 :0,779.00 3.00 0.00 10,773.00
<br /> TOT 10,779.00 :0,779.00 3.00 0.00 10,173.00
<br /> 8710 FINISH HARDWARE
<br /> 0 3-M 17.903.0[ 30.900.00 3.00 0.00 30.900.00
<br /> 4-L ,164.00 7,364.00 7.00 0.00 7,364.00
<br /> TOT 39,264.0C 38,264.00 3.00 0.00 38,264.00
<br /> :ATE 4 PLSC3t
<br /> ' 6-5 107,003.00 100,900.30 3.00 0.00 :00,000.00
<br /> TOT 100,0[3.0[ 100,000.00 0.00 0.00 :00,000.00
<br /> 9250 GTPSR4 BOARD
<br /> 6-5 136,503.0C 136,500.30 0.00 0.00 136,500.00
<br /> TOT 136,502.00 136,500.50 0.00 0.00 :36,500.00
<br /> 19310 CERAMIC TILES
<br /> 6-5 57,565.00 49,200.00 3.00 0.00 49,200.00
<br /> TOT 57,565.00 49.200.00 3.00 0.00 45.200.00
<br /> 19510 ACOUST:CAL CEILINGS
<br /> 6-5 13,000.00 13,000.00 3.00 0.00 13,000.00
<br /> TOT 13,000.00 13,000.00 3.00 0.00 13.000.00
<br /> 39650 RESILIENT FLOORING
<br /> 6-5 21,233.00 10.899.00 0.0C 0.30 35.899.00
<br /> TOT 31.213.00 30.899.00 0.0C 0.30 33,899.00
<br /> 09770 ATHLETIC SURFACE FLOORING
<br /> 6-5 2,500.03 2.500.00 0.00 0.30 3.500.00
<br /> TOT 2,500.03 2.500.00 O.G.• 0.00 2,500.00
<br />
|