My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSIB-98073000
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(0098-07-30) City of SIB Government Center, Police Facility and Library
>
CSIB-98073000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 2:17:54 PM
Creation date
3/25/2013 11:09:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Government Center
Bid No. (xx-xx-xx)
98-07-30
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEWETT-KIER CONSTRUCTION, INC. <br /> ® Building Experience Form <br /> 1. Name and location of project: SAWGRASS ELEMENTARY SCHOOL D-91, BROWARD COUNTY,FL <br /> 2. Nature of firm's responsibility on this project: (mark only one box) <br /> Li Construction Manager at-risk (with Gurantee Maximum Price) <br /> General Contractor ❑ Construction Manager <br /> ❑ Design - Build ❑ Other <br /> 3. Project owner's representative (architect or engineer): <br /> Name: SHRUM-ALI&ASSOCIATES,INC. <br /> Address: 6175 N.W. 153rd STREET,#402,MIAMI LAKES,FL 33014 <br /> Current phone Number ( 305 ) 822-1865 <br /> 4. Project user/agency's representative (owner): <br /> Name: THE BROWARD COUNTY SCHOOL BOARD <br /> Address: 1700 S.W. 14th COURT,FT.LAUDERDALE,FL 33312 <br /> Current phone Number: ( 954 ) 765-6310 <br /> 5. Date project was completed or is anticipated to be completed 9 / 1 / 94 <br /> 6. Size of project (Gross square footage of construction) 90,000 qsf <br /> 7. Cost of project (Construction cost):$ 6,813,78500 <br /> 8. Work for which the staff (employees) was responsible: General Conditions, Carpentry,Hollow Metal, <br /> Hardware,and all Specialties. <br /> 9. Present status of this project:coMPLEt <br /> 1 0. P. M. and other key professionals involved on listed project: (Check box if assigned to this project) <br /> ® ZI JAMES R MANAGER mo' JOHN MAYER, ESTIMATOR/SCHEDULING <br /> WIA OA�M SUPERINTENDENT Nr <br /> �I I�❑11 <br /> Revised June 30 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.