My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2848
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2848
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 9:47:32 AM
Creation date
7/31/2018 2:36:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2848
Date (mm/dd/yyyy)
07/19/2018
Description
Auth City Manager to Nego & Enter Into Interlocal Agreement w/MDC Transpor Plan Org
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny isles Beach <br /> A 18070 Collins Avenue <br /> n <br /> I - x Sunny Isles,Beach, Florida°33160 <br /> '4 (305):. 947-0606 City Halk. <br /> • fi`'� sK,1.r° ', (305)949-3113 Fax s= <br /> _ <br /> MEMORANDUM <br /> TO: The Honorable Mayor and%City Commission <br /> VIA Christopher J Russo, City Manager . <br /> FROM: Claudia C. Hasbun; Planning and Zoning Director <br /> DATE: 7/19/2018 <br /> Authorization to Negotiate.and Enter into.aninterlocal,; <br /> RE: Agreement with the Miami,Dade:County Transportation <br /> Planning Organization for Emergency Pedestrian Bridge <br /> Study <br /> RECOMMENDATION <br /> This Resolution is presented for your consideration . <br /> REASONS. <br /> :The City was awarded-$30,000.for.a planning and feasibility study,for <br /> the 174th Street Pedestrian Bridge- This resolution will allow the City <br /> Manager to accept the award-and enter into an interlocal agreement with <br /> the Miami-Dade Transportation Planning,Organization_(TPO). The_City <br /> then will match'the grant to complete a full analysis of the area for such <br /> project :.,:The study will collect data from:traffic, pedestrian, surveys, <br /> existing "utilities, then-:analyze end, create,a-conceptual base for:the <br /> project;The.TPO allows-5=months.to complete:the study from the date <br /> of the execution of the I nterlocal Agreement <br /> ATTACHMENTS <br /> Description <br /> Resolution, : . <br /> Item Number: 10.F. <br /> 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.