My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erdman Anthony of Florida, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Erdman Anthony of Florida, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 4:43:48 PM
Creation date
9/4/2018 4:38:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discharged or contested in a court of law within thirty (30) days from the date of notice to the <br />ENGINEER; <br />B. The filing of any judgment lien against the assets of the ENGINEER related to the performance of <br />this Contract which is not satisfied, discharged or contested in a court of law within thirty (30) days <br />from the date of notice to the ENGINEER; or <br />C. The filing of a petition by or against the ENGINEER for relief under the Bankruptcy Code, or for its <br />reorganization or for the appointment of a receiver or trustee of the ENGINEER or the ENGINEER'S <br />property; or an assignment by the ENGINEER for the benefit of creditors; or the taking possession of <br />the property of the ENGINEER by any governmental officer or agency pursuant to statutory authority <br />for the dissolution or liquidation of the ENGINEER; or if a temporary or permanent receiver or <br />trustee shall be appointed for the ENGINEER or for the ENGINEER'S property and such temporary <br />or permanent receiver or Trustee shall not be discharged within thirty (30) days from the date of <br />appointment. <br />The ENGINEER shall provide written notice to the CITY of the occurrence of any event of default within ten <br />( 10) days of the ENGINEER'S receipt of notice of any such default. <br />ARTICLE 43 -WAIVER OF SUBROGATION <br />The ENGINEER hereby waives any and all rights to Subrogation against the CITY, its officers, employees <br />and agents for each required policy. When required by the insurer, or should a policy condition not permit an <br />insured to enter into a pre-loss CONTRACT to waive subrogation without an endorsement, then the <br />ENGINEER shall agree to notify the insurer and request the policy be endorsed with a Waiver of Transfer of <br />Rights of Recovery Against Others, or its equivalent. This Waiver of Subrogation requirement shall not apply <br />to any policy, which a condition to the policy specifically prohibits such an endorsement, or voids coverage <br />should the ENGINEER enter into such a CONTRACT on a pre-loss basis. <br />ARTICLE 44 -RIGHT TO REVIEW <br />The CITY, by and through its Risk Management Department, in cooperation with the Contracting/monitoring <br />department, reserves the right to review, reject or accept any required policies of insurance, including limits, <br />coverages, or endorsements, therein from time to time throughout the term of this Contract. The CITY <br />reserves the right, but not the obligation, to review and reject any insurer providing coverage because of poor <br />financial condition or failure to operate legally. <br />ARTICLE 45 -REUSE OF DOCUMENTS <br />All documents including Drawings and Specifications furnished by ENGINEER pursuant to this Contract are <br />instruments of his services in respect of a Project. They are not intended or represented to be suitable for <br />reuse by CITY or others on extensions of the Project or any other project. Any reuse of said documents will <br />be at CITY' s sole risk and without liability or legal exposure to ENGINEER, and CITY shall indemnify and <br />hold harmless ENGINEER from all claims, damages, losses and expenses including attorney's fees arising <br />out of or resulting there from. All preliminary and final design drawings and specification, and the drawings <br />conforming to construction records become the property of the CITY. <br />ARTICLE 46 -OPINION OF PROBABLE PROJECT COST <br />Since ENGINEER has no control over the cost of labor, materials or equipment, or over the Contractor(s)' <br />methods of determining prices, or over competitive bidding or market conditions, his opinions of probable <br />Continuing Service Contract 1.27.15 21
The URL can be used to link to this page
Your browser does not support the video tag.