responsible for preparing weekly meeting minutes and distributing them to all in attendance. <br />1 . 7 .3. It is understood and agreed that the purpose of Consultant's visits to the site is to enable <br />Consultant to carry out the duties and responsibilities assigned to and undertaken by Consultant during the <br />Construction Administration Phase. It is understood and agreed, as well , that another purpose of such visits <br />and representation is that by exercise of Consultant's efforts as an experienced and qualified design <br />professional, It will provide for a greater degree of assurance {i) that the completed work of the contractor(s) <br />will conform to the contract documents; and (ii) that the integrity of the design concept as reflected in the <br />contract documents has been implemented and preserved by contractor{s). Notwithstanding the foregoing <br />purposes of visits to and representation at the construction site, however, it is further understood that <br />Consultant will not, either during such visits or as a result of such observations of contractor(s)' work in <br />progress, supervise, direct or have control over contractor(s)' work. Nor shall Consultant have authority over <br />or responsibility for the means, methods, techniques , sequences or procedures of construction selected by <br />contractor(s), for safety precautions incident to the work of contractor(s) or for any failure of contractor(s) to <br />comply with laws, rules, regulations, ordinances, codes or orders applicable to c:ontractor{s) furnishing and <br />performing their work. Accordingly, it is understood that Consultant can neither guarantee the performance of <br />the construction contracts by contractor(s) nor assume responsibility for contractor(s)' failure to furnish and <br />perform their work in accordance with the contract documents. <br />1.7.4. During such visits and on the basis of such observations, Consultant may disapprove of or <br />reject contractor(s)' work while it is in progress if Consultant believes that such work will not produce a <br />completed project that conforms generally to the contract documents or that it will prejudice the integrity of the <br />design concept or safety standards of the project as reflected in the Construction Drawings, Technical <br />Specifications , General Conditions and Supplemental Conditions. Consultant shall have authority to stop the <br />work whenever such stoppage may be necessary for the proper execution of the Construction Drawings, <br />Technical Specifications, General Conditions and Supplemental Conditions or to protect the public and/or <br />property. Consultant shall also have authority to reject all work, materials and equipment which do not <br />conform to the Construction Drawings, Technical Specifications, General Conditions and Supplemental <br />Conditions, and to decide questions raised by Contractor which arise in the execution of the work. <br />1. 7 .5 . Consultant shall issue necessary interpretations and clarifications of the Construction <br />Drawings, Technical Specifications, General Conditions, Supplemental Conditions and construction contract <br />documents, and in connection therewith prepare work change directives and change orders as required or <br />requested by the City. Consultant may issue additional instructions, by means of drawings, minor change <br />orders or otherwise, necessary to Illustrate changes in the work. <br />1. 7 .6 . Consultant will provide a response to the contractor and City with respect to a request for <br />change order within a reasonable amount of time after receipt of contractor's notice and all necessary backup <br />information requ ired by Consultant to formulate a response. Consultant will have authority to make minor <br />changes in the work not involving extra cost, and not inconsistent with the purpose of the work. Consultant is <br />not authorized to bind City to changes in contract price or time. <br />1. 7. 7 . Consultant shall timely review and approve or take other appropriate action with respect to <br />shop drawings, samples, the acceptability of substitute materials and equi pment proposed by contractor(s), <br />and other data that the contractor{s) are required to submit to ensure conformance to the Construction <br />Drawings, Technical Specifications, General Conditions and Supplemental Conditions. Consultant shall <br />complete its review of submittals, shop drawings, samples and other data so as not to delay the progression of <br />the work, and in any event within fourteen { 14) calendar days of receipt. The City shall be entitled to rely upon <br />the approval by Consultant that the shop drawings, product data, and samples approved by Consultant <br />conform with the Technical Specifications, General Conditions, Supplemental Conditions and design specified <br />in the Construction Drawings, as may be amended. Such reviews and approvals or other action shall not <br />extend to the means, methods, techniques, sequences or procedures of construction or to safety precautions <br />and programs incident thereto. <br />1. 7 .8 . Consultant shall be obliged, in its role as the representative of the City on the project, to <br />Fonn-PSA CCNA Master 091914 <br />Erdman Anthony-14919 <br />101114 <br />5