|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Rachel C. Stuckey, PE, LEED AP, BEMP, CEA
<br />13. ROLE IN THIS CONTRACT
<br />Mechanical Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />16
<br />b. WITH CURRENT
<br />FIRM
<br />8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Erdman Anthony of Florida, Inc., Rochester, NYL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BA/Physics
<br />BS/Mechanical Engineering
<br />17. EDUCATION (DEGREE AND SPECIALIZATION)
<br />FL/ Professional Engineer
<br />NY/ Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Stuckey has been responsible for project management, mechanical design, contract document preparation, facility evaluations,
<br />energy analysis, and construction administration. Rachel has extensive LEED energy modeling experience.
<br />19. RELEVANT PROJECTS
<br />a
<br />(1) TITLE AND LOCATION (City and State)
<br />Nazareth College Math & Science Building
<br />Rochester, NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If
<br />Applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Energy Engineer. Responsible for the energy analysis of this new 65,000 square foot, 4-story building. The facility houses science labs,
<br />research areas, classroom spaces, offices, and student collaborative study space.
<br />b
<br />(1) TITLE AND LOCATION (City and State)
<br />SUNY Oneonta Auxiliary Services Building
<br />Oneonta, NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If
<br />Applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Engineer. Managed MEP design and lead the electrical design for a new standalone 18,500 sf, $5.6M building. The building
<br />will serve as the primary office location for Auxiliary Services on the campus and contain the campus bookstore and retail outlet.
<br />c
<br />(1) TITLE AND LOCATION (City and State)
<br /> MCC Downtown Campus Renovations
<br />Rochester NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If
<br />Applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X ]Check if project performed with current firm
<br />Energy Specialist. Responsible for the energy analysis of this substantial renovation of 348,000 square feet of an existing 590,000
<br />building. The facility will serve as Monroe Community College’s new downtown center. Energy efficient upgrades include improved
<br />insulation and windows, ventilation controls utilizing CO2 sensors and occupancy sensors, variable kitchen hood exhaust, and high
<br />efficiency lighting.
<br />d
<br />(1) TITLE AND LOCATION (City and State)
<br /> Fastrac Markets/ NYSERDA EFP Energy Analysis
<br />28 Locations, NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If
<br />Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Reviewed the lighting before and after the retrofit, estimated the savings, and monitored the energy usage to verify the energy
<br />savings. Twenty-eight locations throughout central New York underwent exterior lighting retrofits. The retrofit consisted of a one-for-
<br />one replacement of metal halide fixtures with LED’s
<br />e
<br />(1) TITLE AND LOCATION (City and State)
<br />Rochester General Hospital Critical Care Center CX
<br />Rochester, NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If
<br />Applicable)
<br />2021
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Manager. Providing Commissioning Services for the new Critical Care Center to be constructed at the Rochester General
<br />Hospital Campus. The project consists of design, construction, acceptance, and warranty phase commissioning services in support of
<br />the 312,457 sq. ft new building, and 64,003 sq. ft renovation at the Rochester General Hospital Campus.
|