My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:22:51 AM
Creation date
9/6/2018 10:19:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH – CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES <br />UTILITY UNDERGROUNDING AND ROADWAY IMPROVEMENTS (CCNA) - RFQ NO. 18-08-01 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SECTION J - FORMS AND ATACHMENTS <br /> <br />PROJECT NAME North County Neighborhood Improvement Project, <br />Northeast Quadrant, Bid Package 11 <br />Pompano Beach, Florida <br />CLIENT Mr. Patrick MacGregor <br />Expansion Coordinator <br />Broward County Water and Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33069 <br />Phone: (954) 831-0904 <br />Email: pamacgregor@broward.org <br />PROJECT START DATE Design: November 2009 <br />Construction: October 2011 <br />PROJECT COMPLETION DATE Design: February 2011 <br />Construction: 2014 <br />ENGINEER’S ESTIMATED <br />CONSTRUCTION COST <br />$23,033,142.00 <br />ACTUAL CONSTRUCTION COST $17,608,000.00 <br />PROJECT SUMMARY <br />The infrastructure improvements to the existing neighborhood included new roadway, sidewalk <br />drainage, swale regrading, landscaping, water, sanitary sewer, and signage, Bid Package 11 was <br />the final area in the North County Neighborhood Improvement, NE Quadrant. The area is <br />primarily residential that was developed in the 1950’s. The existing infrastructure was longer <br />suitable to meet the current standards for water and sanitary sewer facilities. The Project was <br />completed under budget and on time. The North County Neighborhood Improvement Project <br />(NCNIP) Northeast Quadrant, Bid Package 11 included approximately 357 acres of land <br />between Dixie Highway and Federal Highway, north of Sample Road in Broward County. The <br />project included over 50,688 linear feet of <br />new roadway construction, sidewalks, <br />driveway aprons, and sodded swales In <br />addition the project included over 14,777 <br />linear feet of new storm sewer, 12,993 <br />linear feet of exfiltration trench, 64,000 <br />linear feet of water main, 553 Water <br />Services (many of these services were <br />moved from the rear of the lot to the front), <br />49,700 linear feet of reuse water main, <br />796 reclaimed water services, 43,805 <br />linear feet of gravity sewer main, 750 <br />sewer laterals, lift station, and 1,630 linear <br />feet of force main. CTA provided surveying, <br />civil engineering, landscape architecture <br />and CEI services on the project. <br />J | Page 3
The URL can be used to link to this page
Your browser does not support the video tag.