Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Timothy J. Hall, P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />31 <br />b. WITH CURRENT FIRM <br />11 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />University of Maryland (Structural Emphasis, Bachelor of <br />Science, Civil Engineering (1987) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer - Florida No. 50588 (1996) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of Sunny Isles Beach, Utility Undergrounding, <br />Sunny Isles Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project lead for the City of Sunny Isles Beach undergrounding efforts. Project included undergrounding of overhead <br />electrical, telephone, and cable within 2.1 miles along Collins Avenue (A1A). Significant coordination required <br />between FP&L, low voltage utilities and FDOT requirements. Understanding of technical requirements and <br />restrictions of both FDOT and utilities required to deal with the limitations of constructing within the right-of-way. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Fort Lauderdale, Undergrounding of Utilities Continuing Services, <br />Fort Lauderdale, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />In 2009, the City awarded the general services contract to assist in facilitating the undergrounding of utilities within <br />neighborhood through special assessment. Projects required a clear roadmap of procedure, ability to <br />communicate effectively with residents, coordination of utilities, understanding of FP&L tariff and requirements, <br />assistance in drafting proper ordinance, cost estimates, and understanding of special assessment procedures and <br />requirements. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Fort Lauderdale - WW2011 Program, <br />Fort Lauderdale, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />September 2003 <br />CONSTRUCTION (If applicable) <br />June 2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Lead for design services related to City’s Capital Improvements Program which included approximately <br />$636 million in utilities infrastructure repair, replacement, and upgrades. The program includes analysis, modeling <br />and design for improvements to water and wastewater facilities in meeting a comprehensive plan in response to <br />expanded demand and service areas. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />North Miami Beach General Consulting Services, <br />North Miami Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 - Present <br />CONSTRUCTION (If applicable) <br />Varies <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Hall has been the project manager for a number of utility projects for the City of North Miami Beach <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Fort Lauderdale - General Engineering Services Contract <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2006 <br />CONSTRUCTION (If applicable) <br />2014 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Coordinator and point of contact for engineering, landscape, survey, and architectural services provided to <br />the City through open-ended contract. In addition to management of multiple projects, responsible for overseeing <br />design, commitment to schedule and meeting budgets for multi-facetted improvement projects. Projects include <br />programs to provide water and wastewater improvements to existing neighborhoods served by septic systems and <br />without adequate fire protection. Areas served include a mixture of single family, multi -family, commercial, office <br />and industrial uses. In addition to utilities, improvements included streetscape, landscape, drainage, roadway re - <br />alignment and traffic calming. <br />E | Page 17