My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:42:41 AM
Creation date
9/6/2018 10:38:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGINEERING SERVICES FOR <br />Golden Shores Utility Undergrounding and Roadway Improvements <br />D–14IWOP41002.18w_Sunny Isles Beach Golden Shores Undergrounding.indd <br />governmental agencies to provide peer reviews and value engineering reviews. Our team’s expertise can be applied to <br />designs completed or partially completed by other engineering companies. Our experience in all facets of municipal work <br />can be applied to any existing project with positive results and added value to the City of Sunny Isles Beach. <br />Our team includes a subconsultant, Waypoint Engineering and Equipment, LLC, who is well versed in electrical and <br />low voltage design. They will review each of the utility providers detailed network designs. Their intent will be to ensure the <br />City avoids paying for utility owner upgrades that are above and beyond a “like for like” conversion. <br />The common goal of the Kimley-Horn team is to provide the City of Sunny Isles Beach with the most value <br />throughout every aspect of each project assignment. Our knowledge of local construction costs will allow you to <br />accurately budget for upcoming capital projects. Construction costs have seen large swings both up and down over <br />the last five years. Our technicians keep track of current construction cost data through the Florida Department of <br />Transportation (FDOT) databases and reviewing our current projects that are being bid. Based on recent projects bids, we <br />have seen a rise in costs and adjust unit costs in our OPCs accordingly. We look at trends in unit pricing so we can help <br />our clients project costs of future capital projects. <br />Quality Assurance/Quality Control (QA/QC) <br />Quality is a keystone principle of Kimley-Horn. It is one of the key attributes that has enabled us to become one of the <br />leading consulting firms in the country and it is absolutely essential to our continuing success. Our QA/QC manager, <br />Kevin Schanen, P.E., will ensure our services provided for you meet our high standards of quality. Kimley-Horn’s <br />QA/QC program is based on the philosophy that: <br /> Quality is achieved by adequate planning, coordination, training, supervision, and technical direction; proper <br />definition of the job requirements and procedures; understanding the scope of services; and the use of appropriately <br />skilled personnel performing work functions carefully. <br /> Quality is ensured through the careful checking, reviewing, and surveying of work activities by individuals who are <br />not directly responsible for performing the initial efforts. <br /> Quality is controlled by assigning a manager to evaluate all work and procedures followed while providing the <br />services. <br /> Quality is verified through independent reviews by a qualified staff member of the processes, procedures, <br />documentation, supervision, technical direction, and staffing associated with the project development. Project quality <br />is “built in,” not added on. <br /> Quality work is the direct result of careful, properly sequenced, and supervised production, and continuous checking <br />of each work element for completion and correctness by the task leader and project manager.
The URL can be used to link to this page
Your browser does not support the video tag.