Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Kevin M. Schanen, P.E. <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 20 <br />b. WITH CURRENT FIRM <br /> 19 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering / University of Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer / 60251 / 2003 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Town-Wide Undergrounding of Utilities Program <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. Subsequent to a state of Florida mandate that FPL “storm harden” all vital infrastructure and utility lines <br />statewide, resulting in the installation of taller, concrete electric poles, the Town of Palm Beach chose instead to convert all <br />aerial electric, communication, and cable lines to an underground location. Kimley-Horn serves as program manager and prime <br />consultant designing and permitting the underground conversion process in close coordination with FPL, AT&T and Comcast . <br />Kimley-Horn first developed a master plan to outline the schedule, sequencing, phasing, management of traffic impacts, project <br />delivery methods, data collection, public outreach, design criteria, and projected costs. The benefits of undergrounding these <br />utilities include improved neighborhood aesthetics, increased service reliability, and increased levels of safety as the line s are <br />no longer exposed. The entire program, which began in 2016, is expected to take 10 years to complete. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Lake Towers Underground Utilities Conversion Project <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager for the undergrounding of overhead utilities for this project near Bradley Place and Wells Road. Kimley -Horn <br />designed the conduit and pullbox infrastructure for the electric and cable utilities (telephone was already underground in this <br />location) along with providing easement acquisition assistance, utility provider coordination, and infrastructure upgrade des ign <br />services. Because this project was essentially an “island” of underground infrastructure, there was a need to coordinate the end <br />conditions for the north and south limits of the project. Ultimately, the rear easement power lines were removed with the hom es <br />and condominium being served from new underground utility infrastructure. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Nightingale Trail/La Puerta Way Underground Utilities Conversion <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. Kimley-Horn served the Town to perform the undergrounding of overhead utilities for this neighborhood <br />project on the North end of the Island. Kimley-Horn designed the conduit and pullbox infrastructure for the electric, telephone, <br />and cable utilities along with providing easement acquisition assistance, utility provider coordination, and infrastructure u pgrade <br />design services. Because this project was essentially an “island” of underground infrastructure, there was a need to coordinate <br />the end conditions for the north and south limits of the project. Ultimately, the rear easement power lines were removed with the <br />homes being served from utility infrastructure in the front street rights-of-way. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Master Planning for Village-Wide Undergrounding of Utilities <br />Key Biscayne <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal-in-Charge and QA/QC manager. The design and construction of the undergrounding program is anticipated to take <br />multiple years to complete. The underground program will be broken into multiple phases that can be constructed on an annual <br />basis. In order to balance potentially competing priorities such as cost, project duration, traffic impacts for this large -scale <br />project, development of a Master Plan was recommended in order to evaluate these priorities ahead of any detailed design of <br />any single undergrounding phase. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Worth Avenue Restoration Project <br />Palm Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project manager. Kimley-Horn served as site civil, traffic, and undergrounding engineer for this revitalization project within the <br />Town that was brought to life by a group of property owners along Worth Avenue who wanted to revitalize the area and bring it <br />back to its former glory. Kimley-Horn was responsible for the design of all the civil, traffic, and undergrounding of overhead <br />utilities on the project. We provided the detailed design of the electrical, telephone, and cable utilities throughout the th ree-block <br />corridor in the Mid-Town area. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />