My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) <br />LOCAL PERMITTING EXPERIENCECGA has extensive experience and knowledge in all applicable federal, state and local codes, laws and regulations. In our capacity for providing engineering services to many local agencies in Miami-Dade and Broward Counties, our experience and familiarity with regulatory agencies plays a major role during the project approach, design, and permitting phases to allow for a more well-coordinated and smoother permitting process. CGA has been responsible for ensuring that all codes are met and addressed prior to permit submittal, which leads to a reduction of agency comments and limits any project schedule interruption. We have been a part of countless projects and continuous communication efforts with regulatory agencies for all aspects of design. Our familiarity with permitting related to infrastructure projects, specifically in Miami-Dade County, can be demonstrated by listing the applicable regulatory agencies and pertinent codes/criteria which are anticipated to be encountered during the permitting phase of services. <br />• City of Sunny Isles Beach Building Department - Dry Run during design <br />• Florida Department of Transportation – If R/W permit is needed near Collins Ave. <br />• South Florida Water Management District – Dewatering Permit and Environmental Resource Permits <br />• Army Corps of Engineers – Environmental Resource Permit (not anticipated unless work in the intracoastal is needed) <br />• Florida Fish and Wildlife Commission (not anticipated unless work near the intracoastal is required) <br />• Miami-Dade County Department of Environmental Resources Management (DERM) <br />PERFORMANCE RECORDS/EFFECTIVE EMPLOYEE PERFORMANCE AND TRAININGCGA has an exemplary record of performance with each of its contracts. Company-wide, CGA has never had a contract terminated or canceled for cause. <br />The key to effective performance is assigning the right person for the job. The CGA Team represents a highly qualified and experienced professional staff with almost every required discipline in one location. In order to maximize employee utilization and therefore performance, CGA utilizes an accounting software, Ajera, to track not only project budgets, but also employee workloads. <br />In an effort to maintain the highest standards, our team receives continuing education to stay on top of the latest industry standards and processes. Through formal training, seminars and in-house technical sharing sessions our staff is kept abreast of ever-changing methods and technology. <br />24
The URL can be used to link to this page
Your browser does not support the video tag.