My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
94CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />ADDENDUM # 3 <br />DATE:Wednesday, December 5, 2018 <br />TO:ALL PLANHOLDERS <br />FROM: Purchasing Agent <br />RFQ NO.: RFQ 18-11-01 Consulting Engineering Services for Golden Shores Pump Station <br />Rehabilitation (CCNA) <br />SUBJECT:Addendum No. 3 <br />BID SUBMITTAL DEADLINE:Wednesday, November 28, 2018 at 2:30 PM Revised: Monday, <br />December 10, 2018 at 3:00 PM <br />Please attach this addendum to the documents in your possession and include the <br />Acknowledgement of Addenda Form with your response incorporated with the <br />Request for Qualifications. <br /> Revisions:(Note: Deletions will be indicated by strikethrough, additions will be <br /> indicated with bold font): <br />1. Can you please confirm the horsepower of the duty and backup pump? <br />This is not relevant at this time. We are in the consultant selection process not the <br />proposed design. The selected consultant will make recommendations on the pump <br />size at design phase. Please provide your previous experience not proposed ideas. <br />2. When were the pumps last replaced or repaired and what was the extent of the work? <br />This is not relevant at this time. We are in the consultant selection process not the <br />proposed design. The selected consultant will make recommendations on the pump <br />size at design phase. Please provide your previous experience not proposed ideas. <br />3. Are the current pumps sufficiently sized to handle peak flows? <br />It is expected that the selected consultant will evaluate the pumps as part of their <br />services. <br />4. Other than electrical upgrades, installation of telemetry system and replacement and/or <br />removal the emergency generator outside the pump station building or providing access to the <br />building via a new doorway can the City provide an itemized list of other components that need <br />replacement that were not covered during the site visit? <br />It is expected that the selected consultant will evaluate the pump station in its entirety <br />and make a recommendation as part of their services.
The URL can be used to link to this page
Your browser does not support the video tag.