|
27CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />
<br /> Jose Caraballo,
<br />PE
<br />
<br />Project Manager
<br />a. TOTAL b. WITH CURRENT FIRM
<br />15 13
<br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc., Pembroke Pines, FL
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />B.S., Environmental Engineering Professional Engineer: FL
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />Certifications: CTQP Certification: Asphalt Paving Technician - Level 1
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />NW 12th Avenue Force Main Replacement, City of North Miami FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design Manager for design, permitting, and construction of 10,500 feet of 12/10-inch replacement force main in NW 12th Avenue extending from NW 95th
<br />Street to NW 125th Street. The project, located in Miami-Dade County and within the City, replaces aging asbestos-cement and cast iron force mains with
<br />corrosion resistant PVC pipe. A number of private force main connections require relocation and re-connection to the new force main as well as planning for
<br />uninterrupted service during construction. Size: TBD. Cost: $TBD
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />E06-WASD-09; Task Order No. 6: Design of 6,400 LF of Force Main Design, Miami Dade County PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design of approximately 6,400 L.F. of 4-inch, 6-inch, 8-inch and 12-inch DIP force main. The project consisted of replacing several segments of AC force main to
<br />DIP force main. This project required a Class III permit from the Miami-Dade County Department of Environmental Resources Management, due to a required
<br />canal crossing.
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Pump Station Improvement Program (PSIP) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Development of the drainage, yard piping, and utility relocation for a new water reclamation facility. Key elements for this project were the updating the
<br />inadequate drainage system and yard piping for over 3,500 LF of 12-inch DI and PVC reclaimed water main. Additionally, this project had a large amount of
<br />utility relocation to accommodate the new piping.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Doral 48-inch Force Main Improvements Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design Manager for the design of 48-inch diameter PCCP pipeline improvements to increase wastewater transmission capacity within the Doral basin of the
<br />County’s wastewater collection and transmission system. The project, located in NW 54th Street, includes approximately 4,200 feet of pipe, a jack-and-bore
<br />segment under a major highway, is located within a high-density traffic roadway, and intersects numerous utilities.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />CDWWTP Water Reclamation Facility, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Development of the drainage, yard piping, and utility relocation for a new water reclamation facility. Key elements for this project were the updating the
<br />inadequate drainage system and yard piping for over 3,500 LF of 12-inch DI and PVC reclaimed water main. Additionally, this project had a large amount of
<br />utility relocation to accommodate the new piping.
<br />
|