My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />SIMILAR WORKFIRM REFERENCES & <br />COMPLETED <br />1. Project Title: WASD PS 440 (Phase 2) Upgrades <br />2. Project Location: Miami Gardens, FL <br />3. Project Description: The Miami-Dade County Water and Sewer Department (WASD), in an effort to comply with the 2013 <br />Consent Decree and improve operations of its wastewater collection system, established the Pump Station Improvement Program. <br />Under this program, WASD will repair or replace over 140 existing and non-compliant wastewater pump stations. The improvements <br />vary from pump upgrades to complete pump station and force main upgrades. <br />CES, as one of the design consultants, was tasked to analyze and design the improvements for PS 440 (Phase 2). Phase 1was simply <br />to bring the station to compliance with minimal expense and allow for maintenance access. Phase 2 was to install a completely <br />new submersible pump station within the public right of way. The design included demolition plans, civil site plans, mechanical <br />plans, structural plans, and electrical plans. The original design included a new 8-foot diameter wet well and valve vault, new 10 HP <br />pumps, 6-inch diameter discharge piping, converting the existing wet well into a receiving manhole, installing approximately 120 <br />feet of 18-inch gravity piping, and a new electrical control panel. Our team provides full design services, which includes surveying, <br />geotechnical engineering, civil engineering, mechanical engineering, structural engineering, and electrical engineering. <br />The main complexities of these projects and designs are the accelerated schedules required to meet the Consent Decree schedules. <br />The aggressive schedule requires efficient project management and effective project controls. <br />4. Owner’s Contact Name and Address: Miami-Dade County Water and Sewer Department (WASD), 3071 SW 38th Avenue, <br />Miami, Florida 33146. <br />Contact Person/Phone No.: Reinaldo Rivera, PE / 305-446-7450 <br />5. Project Duration (Dates): 04/2015-10/2016 <br />6. Was the project completed within schedule? Yes <br />If not, what was the original completion date? <br /> 7. Location of office performing work: Pembroke Pines <br /> 8. Was applicant the prime firm, or Subconsultant firm? Prime <br /> 9. Was work performed in-house? Yes <br /> 10. Type/Scope of services provided? Civil Engineering, Structural Engineering, Mechanical Engineering, Electrical <br />Engineering, and Construction Phase Services <br /> 11. Names of key team personnel for this project? Jose Caraballo, PE; Engineer of Record, Ranthus Fouch, PE; QC Review <br /> 12. Which members of your proposed team worked on this project? Jose Caraballo, PE, Ranthus Fouch, PE
The URL can be used to link to this page
Your browser does not support the video tag.