Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12 NAME <br /> JAMES HART, PE <br />13 ROLE IN THIS CONTRACT MECHANICAL ENGINEERING <br />14. YEARS EXPERIENCE a TOTAL <br />33 <br />a TOTAL <br />10 15 FIRM NAME AND LOCATION (City and State) CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION) <br /> B.S., CHEMICAL ENGINEERING, (MATHEMATICS MINOR), <br /> CLEVELAND STATE UNIVERSITY, 1985 <br /> B.S., BUSINESS ADMINISTRATION & MARKETING, <br /> BOWLING GREEN STATE UNIVERSITY <br />17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) PE, FLORIDA, NO. 65420 <br /> PE, OHIO, NO. E-58285 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Hart is a Professional Engineer with significant experience in all major phases of equipment and system design for a wide array of process industries. Experienced in scrubbing technology (HCl, H2S, NOx, ethanol, ethylene oxide, emergency chlorine, odor control, steel pickling lines) and anaerobic digesters, filtration and evaporation. Experienced in water pollution remediation, ozone application, UV sterilization and thermo oxidation. Demonstrated ability to organize work and manage major projects to meet cost and schedule deadlines. Possesses a unique blend of engineering, CADD and computer programming knowledge and experience. Prior Experience - Prior to joining the firm, worked for 20+ years in various private sector companies, primarily in the areas of instrumentation, process design, scrubber design, water treatment systems (including filtration, thermal oxidation, ozonation and UV disinfection). He also worked for a major producer of concrete admixtures, in their research facility. 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Wastewater Treatment Plant 2 MGD Expansion <br />Town of Davie , Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. coordinated the development of the process design, P&ID drawings, instrumentation and specifications for $9 million expansion. Also involved with modernizing their data acquisition system (SCADA), tying together water and wastewater control systems at two locations into one location. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />NE Quad Drainage Improvement <br />Hallandale Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. Designed storm water PLC-based control system for 96,000 GPM stormwater injection well disposal system. System consisted of 2 pump stations, feeding 16 drainage wells. Data is coordinated with SFWMD, and will become the prototype for future drainage projects. SCADA connectivity and historian, data analysis. Total Project Cost: $484,000 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Water Reclamation Facility Expansion <br />Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Assisted on all phases of $14,200,000 Design/Build project for 2 MGD expansion (10.1 to 12.6 MGD) to existing facilities, including aeration, instrumentation, chlorination, and detail design. Tasks included specification writing, process review, site inspections and coordination between contractor and client for the addition of a 5th concrete Aeration Basin (approx. 250’ x 28’) containing eight cells, a fourth 100 ft diameter Secondary Clarifier, a third 8000 gpm Injection Well Pump with appurtenances, RAS pumping system piping modifications, Upsizing of two 200 HP Aeration Blowers to 500 HP each, the addition of a 5th 500 HP Aeration Blower, and conversion of four existing Aeration cells and One new Basin cell to Anoxic operation. Additional improvements include replacement/ modernization of the existing Plant-Wide SCADA system. Modeled entire expansion in 3D that proved invaluable during construction. Project Cost: $14.2M <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Degasifier Addition and Odor Scrubber Replacement <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer. Design/Build project to add one degasifier and blower, and replace an existing odor scrubber with a larger capacity scrubber. Replaced all piping and modified inter-connecting ductwork. Analyzed using existing scrubber, or replace with another, larger unit. 96